Skip to main content

We have the technology

'Le Barbare' or The Barbarian, the biggest wheel loader in the Caterpillar range, had already clocked up a respected 48,000 hours of heavy duty in the Belgian quarry Carrieres d'Antoing when a need for a bit of rejuvenation was identified. To carry out this careful operation, the local Caterpillar dealer Bergerat Monnoyeur tore the impressive 193tonne 994D wheel loader into thousands of pieces, reworked them all and then reassembled the whole machine with new or refreshed parts: it performed a full rebuild
July 10, 2012 Read time: 2 mins
'Le Barbare' or The Barbarian, the biggest wheel loader in the 178 Caterpillar range, had already clocked up a respected 48,000 hours of heavy duty in the Belgian quarry Carrieres d'Antoing when a need for a bit of rejuvenation was identified.

To carry out this careful operation, the local Caterpillar dealer 2154 Bergerat Monnoyeur tore the impressive 193tonne 994D wheel loader into thousands of pieces, reworked them all and then reassembled the whole machine with new or refreshed parts: it performed a full rebuild giving the machine a second life and a new warranty.

Carrieres d'Antoing, located close to the city of Tournai, produces some 4 million tonnes of limestone a year. Three Caterpillar wheel loaders, the 992G, 994F and 'le Barbare', the 994D, are used for loading trucks which then transport the limestone to a crusher.

The oldest of the loaders, the 994D, has been working in the quarry since 1993, and it went through a revision at 24,000 hours, and last December, seven year later, it was transported to the Bergerat Monnoyeur workshop in Overijse for another revision. This time, eight technicians were dedicated to rebuild the machine from a smallest detail all the way to replacing the engine.

Given the monstrous length of 17m, width of 5.5m and height of 6.5m, it took three months and more than 5,000 labour hours to finish the work.

As usual for a machine going through a Cat Certified Rebuild programme, the 994D was disassembled, reworked, rebuilt from scratch, and then assembled again. Among many other changes, the original steering wheel was replaced by joysticks and the machine also received a brand new engine. Its technology was updated to the latest state-of-the-art, which extends its life for at least 15,000-20,000 hours to come.

Caterpillar says that the cost of a rebuild is significantly lower than new, varying from 55-70% of the transaction price of a new machine, "which makes the rebuild a good option to consider also in challenging economic conditions."

For more information on companies in this article

Related Content

  • The Terex TR60 makes the grade at Longcliffe quarry in Matlock
    May 1, 2018
    Calcium carbonate and limestone processor Longcliffe is using a number of Terex haulers to move premium limestone and recycled materials around its quarry in Derbyshire. Apart from the construction sector, Longcliffe’s Brassington Moor Quarry near Matlock supplies a variety of industries, from animal feed manufacturers to glass, plastic and adhesive businesses.
  • Wheeled loaders working hard in tough conditions
    April 16, 2018
    Wheeled loaders from XCMG are working hard in two extremely tough applications, in Russia and Mongolia Both of these extraction operations require the equipment to work long hours and often in extremes of climate. In the Xilin Gol League of Inner Mongolia, the XCMG wheeled loaders are working at a surface extraction operation. The site has been extremely productive, achieving a production capacity of over 22 million tonnes in the 10 years since it started. The operation has always opted to use XCMG loa
  • Innovative solutions to earthmoving needs
    January 3, 2013
    Several manufacturers are offering improved earthmoving machines, with more to come - Mike Woof reports. One of the most notable developments comes from Caterpillar, with the unveiling of a hybrid excavator in the shape of its 336E H model. The machine is having its public launch at the bauma exhibition in Spring 2013 and will start rolling out of the factory in March 2013, while customers will be able to place orders from February 2013. Unlike other hybrid excavators on the market at present, the Cat 336E
  • SDLG wheeled loaders for Moscow’s new roads and buildings
    March 28, 2014
    Two factories in Russia’s greater Moscow region are using SDLG wheeled loaders to help distribute sand and gravel for use in new roads being built across the region With Russia one of the world’s fastest growing market economies, its need for infrastructure expansion has meant more roads and, as a result, a massive increased need for sand and gravel production. Two sand and gravel factories near Moscow are said to be helping produce the new roads, sidewalks, and also, buildings.