Skip to main content

We have the technology

'Le Barbare' or The Barbarian, the biggest wheel loader in the Caterpillar range, had already clocked up a respected 48,000 hours of heavy duty in the Belgian quarry Carrieres d'Antoing when a need for a bit of rejuvenation was identified. To carry out this careful operation, the local Caterpillar dealer Bergerat Monnoyeur tore the impressive 193tonne 994D wheel loader into thousands of pieces, reworked them all and then reassembled the whole machine with new or refreshed parts: it performed a full rebuild
July 10, 2012 Read time: 2 mins
'Le Barbare' or The Barbarian, the biggest wheel loader in the 178 Caterpillar range, had already clocked up a respected 48,000 hours of heavy duty in the Belgian quarry Carrieres d'Antoing when a need for a bit of rejuvenation was identified.

To carry out this careful operation, the local Caterpillar dealer 2154 Bergerat Monnoyeur tore the impressive 193tonne 994D wheel loader into thousands of pieces, reworked them all and then reassembled the whole machine with new or refreshed parts: it performed a full rebuild giving the machine a second life and a new warranty.

Carrieres d'Antoing, located close to the city of Tournai, produces some 4 million tonnes of limestone a year. Three Caterpillar wheel loaders, the 992G, 994F and 'le Barbare', the 994D, are used for loading trucks which then transport the limestone to a crusher.

The oldest of the loaders, the 994D, has been working in the quarry since 1993, and it went through a revision at 24,000 hours, and last December, seven year later, it was transported to the Bergerat Monnoyeur workshop in Overijse for another revision. This time, eight technicians were dedicated to rebuild the machine from a smallest detail all the way to replacing the engine.

Given the monstrous length of 17m, width of 5.5m and height of 6.5m, it took three months and more than 5,000 labour hours to finish the work.

As usual for a machine going through a Cat Certified Rebuild programme, the 994D was disassembled, reworked, rebuilt from scratch, and then assembled again. Among many other changes, the original steering wheel was replaced by joysticks and the machine also received a brand new engine. Its technology was updated to the latest state-of-the-art, which extends its life for at least 15,000-20,000 hours to come.

Caterpillar says that the cost of a rebuild is significantly lower than new, varying from 55-70% of the transaction price of a new machine, "which makes the rebuild a good option to consider also in challenging economic conditions."

For more information on companies in this article

Related Content

  • Terex excavators for Belgian company
    March 2, 2012
    Belgian Terex distributor, Terex Kemp, is supplying 18 excavators to Groep Verbraeken Construction in a deal that the company says should help instil confidence in the Belgian construction industry. Terex Kemp, the main Terex distributor for Belgium since 2003, is delivering ten TC35 and five TC48 compact crawler excavators, alongside three TW85 compact wheeled excavators. The company's sale of Terex excavators follows two prior successful months, which saw them sell more than 55 machines in July and August
  • Cutting to the chase – with milling tools
    May 16, 2016
    Powerscreen is celebrating 50 years in business this year, and it will launch celebrations at the Hillhead (28-30 June, Buxton, England). Colin Clements, global product line director said: “Powerscreen have been providing the crushing and screening industry with high quality, innovative products for 50 years and we are excited to celebrate that success with those who matter - our distributors and customers. By kicking off the celebrations at Hillhead, we will be able to showcase new and revamped equipmen
  • Ibiza quarry relies on Cat
    July 30, 2012
    Forty years ago the father of Juan Cardona, the current owner of the quarry Cantera Can Orvay on the island of Ibiza, Spain, started extracting limestone. Today, with 20 employees and a daily output of 3,000tonnes, the company, Áridos y Prefabricados, has grown to become the biggest family owned quarry in the island. "When my father asked if I'd like to study or work, I said I'd like to work. And so I've been working here for 27 years. Since my father's retirement, I've been in charge of the quarry," Juan C
  • Noise reducing pavement for Motorring 3?
    January 29, 2024
    The Danish parliament has ordered noise reduction studies to be done on the Motorring 3 motorway near the capital Copenhagen.