Skip to main content

Volvo moves mountains in Portugal

Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula. The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in t
June 8, 2015 Read time: 2 mins
7659 Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula.

The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in the late 1970s, which is treacherous, especially in winter.

The new project is to extend the A4 motorway from Porto from where it now stops at Amarante to Vila Real but it will go straight through the mountain and include the twin parallel tunnel Túnel do Marão running nearly 6km east to west.

It will be the largest road tunnel in Portugal and one of the largest on the peninsula. Working on the project is underground construction specialist EPOS - Empresa Portuguesa de Obras Subterrâneas - which is already behind some of the most important road and rail tunnels in Portugal, Spain and Algeria.

EPOS began work on the twin tunnels in October 2014 and plans to finish concreting and paving stages by February 2016. EPOS is still on the excavation stage and has excavated around 35% of the tunnel’s length using 22 pieces of Volvo construction equipment, of which 13 were purchased shortly before the project began.

Part of a larger 71-strong fleet, provided and serviced by independent dealer Ascendum Portugal, EPOS’s Túnel do Marão contingent includes four Volvo EW140D wheeled excavators, four L220H wheeled loaders and 14 A40G articulated haulers.
“On a project like this, where work continues around the clock, 30 days a month, 100% machine availability is one of our biggest requirements. We cannot risk delay due to unscheduled downtime,” said Dias de Carvalho, EPOS’s general manager of 20 years.

“I have relied on Volvo Construction Equipment for decades and the quality of the machines, their ease of maintenance and the service provided by Ascendum Portugal has never let me down.”

Related Content

  • Major fleet
    February 6, 2012
    POLAND'S new A1 highway is the country's biggest road project at present and when complete, it will run 568km north to south from Gdansk to Gorzyczki, cutting the journey time from 10-6 hours. The project is a key one for Poland's economy and the highway will provide a vital new link for cross-country truck transport. This route forms part of the Trans-European Transport route connecting Norway with Greece, and work started in October 2005 on the first 100km phase, which was
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Volvo’s H-series wheel loaders set for heavy-duty workouts
    April 4, 2016
    Volvo Construction Equipment’s latest H-Series wheeled loaders give a high performance in heavy-duty operations. All the machines - L150H, L180H, L180H HL (High-Lift), L220H and L250H - are equipped with Volvo’s OptiShift technology. Volvo says this eliminates power loss in the torque converter and reduces fuel consumption by up to 18%. Combined with Volvo CE’s patented Reverse By Braking (RBB) technology, OptiShift boosts productivity and efficiency in all applications. RBB is ideal for short cycl
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.