Skip to main content

Volvo CE’s arduous Andes assignment

Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian hi
August 20, 2013 Read time: 4 mins
A 60-strong fleet of Volvo CE road-building machines is being used to construct a 140km highway across the Andes Mountains in Colombia
Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains.

A fleet of 60 Volvo Construction Equipment (359 Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highway contractor MHC, a company with a long track record of overcoming huge civil engineering challenges – often in extremely hazardous conditions.

These dangers are not restricted to working in the mountainous terrain that is typical of Colombia’s topography, but also in areas where the country’s guerrilla groups are active. But neither peril has held the company back. Now into its fourth generation of family members, MHC has become one of the preeminent highway contractors in Colombia, with over 900 employees and US$600 million of contracts – and Volvo CE has been with them along the way.

MHC’s president Mario Huertas Cotes has been a supporter of Volvo CE since he first purchased six second-hand Volvo 861 haulers in 1982. Even though some may say they should now be museum pieces, these same machines from the 1970s are still working and have logged more than 60,000 hours. “We never get rid of equipment in Colombia,” said Huertas jokingly. “The trick is knowing where best to deploy machines as they age.”

As well as possessing a shrewd attitude to handling equipment, the firm is also adept at handling the sensitive issue of working in remote and potentially dangerous parts of the country. “Building in a conflict zone is not so difficult,” said Huertas defiantly. “You don’t beat these people [guerrilla groups] with bullets, but by providing better social conditions. The areas of Colombia where we operate are often poor, and we provide much-needed jobs and incomes, as well as buying local resources. We are regarded by the guerrillas as helping the people and are left alone.”

 With the security situation in Colombia now much improved, the $400 million Andes highway project is just one of the many new construction contracts up for grabs – although it is certainly one of the most ambitious. The existing road between Bacaramanga and Cucuta is narrow, single-tracked, steep and extremely slow-going, with average speeds of only 20km per hour. But when completed, speeds will rise to as much as 80km per hour.

As if building 140km of highway weren’t challenging enough, altitudes range from 900m above sea level up to 3,600m. The steepness of the road will need to be reduced to a maximum incline of 7.5% (currently it is up to 18%) and the road levelled out. This will shorten the present route by 20km – and reduce travel times from Bucaramanga to Cucuta from today’s six hours to just two-and-a-half hours.

MHC has taken full responsibility for the design and construction management of the highway, including all bridges and tunnels – a job made harder by the need to keep the existing road open throughout the build. Several of the bridges are long span – four are over 120m, while one is 640m with columns 80m high, making it one of the tallest in the country. The remaining eight bridges range from 40 to 100m in length – there are also over 1,000m of tunnels being constructed. At its peak MHC will have up to 1,700 people working at the site (there are currently 400).  More than 350,000m³ of earth has to be moved per kilometre of road, making this an enormous earthmoving project. Stabilising the steep slopes of the road is also crucial, especially so in Colombia’s rainy climate where landslides are commonplace. These same slopes put heavy demands on the transmissions of construction equipment, and the high altitude requires adjustment in the treatment of the biodiesel (the use of biodiesel is a must for government projects). Fortunately, all MHC’s newer Volvos are protected by customer support agreements that require local Volvo dealer Chaneme to provide preventative maintenance, consumables and repairs, all conducted on site.

Huertas has managed his family company through some of the most difficult times in Colombia’s modern history. Now with a full order book and his 28-year-old son, Esteban, working as managing director for the Bucaramanga-Cucuta project, the company is moving into its eighth decade and fourth generation with great optimism.

Related Content

  • Hitachi wheel loader ZW5550-5 works in Lasa Marmo’s Whitewater quarry
    November 11, 2015
    The largest wheel loader in the Hitachi range has been delivered to Lasa Marmo’s Whitewater marble quarry near the village of Laas in northern Italy. The new ZW550-5’s main function is to lift each marble block that has been extracted from the cavernous site – situated 1,600m above sea level – and transport it through a series of passageways to an outdoor storage area. The ZW550-5 was delivered in December by Comac, a sub-dealer of the Italian Hitachi dealer for construction machinery, SCAI. The fuel
  • Improved runways for Jeddah International Airport
    August 21, 2013
    With an increasing number of aircraft using Jeddah International Airport in Saudi Arabia, the authorities realised there was a need to upgrade the facilities. King Abdulaziz International Airport opened in 1982 and serves over 15 million passengers/year, with a high percentage travelling on the annual Islamic pilgrimage to Mecca, some 80km away. The city has the largest port on the Red Sea and is named after Abd al-Aziz ibn Saud, the former king and founding father of Saudi Arabia, and is one of the kin
  • CECE Summit – is Europe ready for a digital construction worksite?
    November 20, 2015
    The CECE has voiced his concern over government regulations that could strangle innovation for the digitalisation of construction machinery. China’s imploding economy was another topic at the recent conference in Brussels, reports David Arminas. The CECE has urged the European Parliament and European Commission to enact legislation that promotes rather than hinders the construction sector’s transition to a digitalised way of working. “We need a smart regulatory framework that helps to unlock the full poten
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.