Skip to main content

Volvo CE machines in the heat of Qatar

Construction machines from Volvo CE are helping to build a city in the desert in Qatar. The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving
May 14, 2018 Read time: 2 mins
The Volvo CE machines are coping with Qatar’s tough climate

Construction machines from 359 Volvo CE are helping to build a city in the desert in Qatar

The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving sustainable development by 2030, Lusail City represents an ambitious vision for the future of Qatar. Turning this vision into a reality, Lusail is being fitted with a district cooling system, featuring 175km of piping. This will be one of the world’s largest central cooling systems.

This will save an estimated 200,000tonnes of carbon dioxide emissions annually, limiting the harmful effects on the ozone layer. Moreover, a 24km waste pipe is being laid underneath the city, as an advanced and efficient way of disposing of human waste to recycling and treatment plants outside of the city.

To encourage residents to adopt a sustainable lifestyle, a light railway, water-taxi system and underground pedestrian tunnels are also being constructed, promoting alternative means of travel. Lusail has been under construction since 2009, and more than 45,000 workers are on site/day. A number of Volvo CE excavators, ADTs, wheeled loaders and soil compactors are on site daily, clearing room for foundations and underground tunnels. Although digging through the porous sandstone is tough work, it is the intense heat that provides the biggest challenge. “All machines must be equipped with air-conditioning units and operators are instructed to take regular breaks to prevent fatigue and heatstroke,” said Hadi Kaii, machine owner and Volvo CE customer at EIB Qatar.

Related Content

  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due
  • Florida road repaving delivers better surfacing
    April 7, 2017
    Paving the road for Florida’s latest mega project is the job of Volvo CE equipped concrete and asphalt specialist Ajax Paving Industries. Florida’s Gulf Coast provides a strong draw for tourists and residents alike, with coastal cities like North Port featuring a humid subtropical climate, beaches and resorts. But beyond the city’s sandy beaches, the streets of North Port had fallen into disrepair, causing transportation troubles.
  • Pavers produce on Chinese road building project
    May 19, 2015
    Volvo tracked pavers are helping China meet its ambitious programme of building 10,000km of roads annually. China’s ambitious road building programme is seeing over 10,000km of new highway being completed every year. Productivity, reliability and good uptime of equipment are key to this programme being achieved. And to the north of Xi’an, four Volvo Construction Equipment (Volvo CE) ABG8820 tracked pavers recently worked 14 hours/day paving the final layer of asphalt on a new highway. This 96km route opened
  • Volvo CE: construction must reduce greenhouse emissions
    March 10, 2017
    Construction is the third highest sector for producing greenhouse gas emissions, behind the oil and gas sector and chemicals. Construction accounts for 30% of global greenhouse gas emissions – and around 76% of these come from fossil fuel combustion.