Skip to main content

Volvo CE machines in the heat of Qatar

Construction machines from Volvo CE are helping to build a city in the desert in Qatar. The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving
May 14, 2018 Read time: 2 mins
The Volvo CE machines are coping with Qatar’s tough climate

Construction machines from 359 Volvo CE are helping to build a city in the desert in Qatar

The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving sustainable development by 2030, Lusail City represents an ambitious vision for the future of Qatar. Turning this vision into a reality, Lusail is being fitted with a district cooling system, featuring 175km of piping. This will be one of the world’s largest central cooling systems.

This will save an estimated 200,000tonnes of carbon dioxide emissions annually, limiting the harmful effects on the ozone layer. Moreover, a 24km waste pipe is being laid underneath the city, as an advanced and efficient way of disposing of human waste to recycling and treatment plants outside of the city.

To encourage residents to adopt a sustainable lifestyle, a light railway, water-taxi system and underground pedestrian tunnels are also being constructed, promoting alternative means of travel. Lusail has been under construction since 2009, and more than 45,000 workers are on site/day. A number of Volvo CE excavators, ADTs, wheeled loaders and soil compactors are on site daily, clearing room for foundations and underground tunnels. Although digging through the porous sandstone is tough work, it is the intense heat that provides the biggest challenge. “All machines must be equipped with air-conditioning units and operators are instructed to take regular breaks to prevent fatigue and heatstroke,” said Hadi Kaii, machine owner and Volvo CE customer at EIB Qatar.

Related Content

  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Rain storms destroy Beijing’s road surfaces
    August 17, 2012
    As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority. Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.
  • Terex breaking new ground in China
    November 28, 2018
    Terex has this week staged a breaking ground ceremony on the site of what will be a new assembly and fabrication facility for Genie aerial work platforms in Changzhou, eastern China. Kieran Hegarty, president of Terex Materials Processing (Terex MP), and Colin Clements, Powerscreen global product line director, attended the event – marking the latest stage of ambitious Terex’s Chinese market development. Powerscreen, the major Terex MP global quarrying equipment manufacturer, who offer a full product line
  • Morocco extraction site service capability
    July 15, 2016
    Phosphate extraction is carried out on a huge scale in Morocco in harsh, hot and often remote locations. Servicing this equipment is no easy task given the conditions, with special machines having to be used. Phosphate is in high demand. It is used in fertilizer, detergent and food additives. However its fastest growing market is in the manufacturing of lithium-ion batteries, now being used widely for commercial goods as well as electric vehicles. As Morocco is the world's third-largest producer of phosphat