Skip to main content

Volvo CE machines in the heat of Qatar

Construction machines from Volvo CE are helping to build a city in the desert in Qatar. The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving
May 14, 2018 Read time: 2 mins
The Volvo CE machines are coping with Qatar’s tough climate

Construction machines from 359 Volvo CE are helping to build a city in the desert in Qatar

The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving sustainable development by 2030, Lusail City represents an ambitious vision for the future of Qatar. Turning this vision into a reality, Lusail is being fitted with a district cooling system, featuring 175km of piping. This will be one of the world’s largest central cooling systems.

This will save an estimated 200,000tonnes of carbon dioxide emissions annually, limiting the harmful effects on the ozone layer. Moreover, a 24km waste pipe is being laid underneath the city, as an advanced and efficient way of disposing of human waste to recycling and treatment plants outside of the city.

To encourage residents to adopt a sustainable lifestyle, a light railway, water-taxi system and underground pedestrian tunnels are also being constructed, promoting alternative means of travel. Lusail has been under construction since 2009, and more than 45,000 workers are on site/day. A number of Volvo CE excavators, ADTs, wheeled loaders and soil compactors are on site daily, clearing room for foundations and underground tunnels. Although digging through the porous sandstone is tough work, it is the intense heat that provides the biggest challenge. “All machines must be equipped with air-conditioning units and operators are instructed to take regular breaks to prevent fatigue and heatstroke,” said Hadi Kaii, machine owner and Volvo CE customer at EIB Qatar.

Related Content

  • Volvo CE ends 2023 with healthy sales
    January 29, 2024
    But despite increased orders in North and South America, overall global order intake remained low, declining by 26%, primarily caused by lower demand in China.
  • Volvo CE benefits from strong sales of construction machines
    July 18, 2019
    Volvo CE reports strong financial performance on the back of healthy sales. The firm says that improvements in the key European and North American markets, coupled with a strong focus on its service business, volume flexibility in the industrial system and tight cost control have helped the company to deliver a good all round performance in its second quarter 2019 results. Net sales in the second quarter increased by 10%, amounting to SEK 26.814 billion, compared with SEK 24.403 billion in Q2 2018. Operati
  • Australia’s new airport in Queensland
    August 18, 2015
    The first new airport constructed in Australia for 45 years is now open for business. The Brisbane West Wellcamp Airport in Queensland is located 17km to the west of Toowomba. The facility was completed at the end of last year by Wagners, an Australian family-owned construction company. Toowoomba lies in the Darling Downs region of Queensland, located 126km west of Queensland’s capital city, Brisbane. Toowoomba’s population of approximately 165,000 makes it Australia’s second-most populous inland city. T
  • Qatar to spend up to $100 billion on road and rail networks before FIFA World Cup
    February 29, 2012
    According to Business Monitor International (BMI), Qatar is expected to spend US$80-100 billion over the next five years to prepare and deliver the infrastructure required to support the huge influx of visitors forecast to attend the 2022 FIFA World Cup.