Skip to main content

Volvo CE machines assisting in extraction operation in Madagascar

A fleet of six Volvo EC480D excavators are the key machines for an extraction operation in Madagascar. The new site is producing thousands of tonnes of Chromite ore every day. Chromium is a relatively rare mineral, with South Africa claiming up to 70% of the earth’s reserves. But neighbouring island Madagascar also has significant deposits, and it was to this, the world’s fourth largest island, that Indian exploration firm APC sent its geologists to scout for suitable mining opportunities. They struck luck
October 4, 2018 Read time: 2 mins
Machines from Volvo CE are being used at an extraction operation in Madagascar
A fleet of six 2394 Volvo EC480D excavators are the key machines for an extraction operation in Madagascar. The new site is producing thousands of tonnes of Chromite ore every day.


Chromium is a relatively rare mineral, with South Africa claiming up to 70% of the earth’s reserves. But neighbouring island Madagascar also has significant deposits, and it was to this, the world’s fourth largest island, that Indian exploration firm APC sent its geologists to scout for suitable mining opportunities. They struck lucky, and a one-day drive north of the capital of Antananarivo, APC has found and secured the mining concession over a vast 59,000ha area of chromite-rich land.  This is APC’s first venture into running its own mine. The firm is using its excavators to strip the overburden, then expose and extract the chrome body. The excavators then load a fleet of haulers with the ore for the 1.5km journey to the beneficiation plant for crushing and processing.

The excavators are currently working on an ore body that is 25m wide, 600m long and 80m deep. The Volvo EC480D is well suited to the task, as these machines are able to cope with the abrasive nature of the material they are handling. Chromite is an extremely abrasive ore, and the rock buckets fitted to the excavators have had additional steel welded to prolong bucket life. Major repairs and servicing is carried out by Materauto, which also provides local customer support, under the direction of its general manager Alexandre Dupré, and a local APC team conducts daily maintenance checks.

It remains early days for the project, with mining sites opening all the time and production output forecast to double in 2019. The company has identified 120 potential sites within its concession that have commercially attractive ore bodies. But APC is also keen for the local community to benefit from the success of the project.

The firm has also provided important infrastructure to the areas where it is operating, providing 80km of roads, building three new schools and boring wells that have brought clean and fresh water to ten villages.

For more information on companies in this article

Related Content

  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Mobile crushing boosts quarry
    July 19, 2012
    Crushing equipment from Metso is helping boost production and efficiency at the Barrasford Quarry in the UK. Run by Tarmac Quarry products, the operation is now using a Lokotrack LT140 track-mounted mobile crusher, a pair of Lokolink mobile conveyors and several field conveyors. The company is changing the operation from a static to a mobile crushing operation, and it says installing the Metso machinery has helped reduce manpower at the site. The crusher and the conveyors have replaced a pair of static c
  • Danish digging for Leica Geosystems’ 3D machine control
    October 26, 2017
    In Denmark’s northern Jutland, Leica Geosystems’ equipment is being used to help build a 40km motorway, one of the fastest-built such projects in the country’s history. The Danish Road Directorate is the client for the €5.4 million motorway between the two Danish cities of Herning, to the south with around 50,000 people, and Holstebro, a city of about 35,000 people, north of Herning. Preliminary ground investigations were made in 2013 and work started in 2015 with completion set for 2018.