Skip to main content

Upgrade for Russian quarry

In Russia, the Ministry for Industry established the Gurovo Beton quarry in the Tula region south of Moscow in 1951.
February 22, 2012 Read time: 2 mins
RSSIn Russia, the Ministry for Industry established the Gurovo Beton quarry in the Tula region south of Moscow in 1951. The 1960s and 1970s were periods of boom for the quarry but the late 1990s saw severe recession in Russia, with limestone output falling to very low levels. In 2006 2551 HeidelbergCement acquired a majority stake in the company and the whole quarry is being modernised. In addition to a new Austrian crusher, a Chinese cement plant has been built, new conveyors installed and offices upgraded. But key to its long term success is a comprehensive modernisation of the quarry's mobile machinery. A new fleet of 2394 Volvo equipment has arrived, comprising wheel loaders (L90E, L110F, L150F, three L220F and L220E), an EC210Blc excavator, an EC700B LC excavator - and three A40E articulated haulers.

These new machines are not replacing older machines but are fundamentally changing the way the quarry works. One of the biggest problems the quarry faces is how to remove the extremely thick overburden covering the limestone, which ranges from 40 to over 50m thick. In the past the quarry has used an old and unreliable high voltage electric powered excavator, which cut away at a face 11m high.

The electric excavators will be replaced over the next year by Volvo's 70tonne excavator, fitted with a 5m³ bucket and cutting at a smaller 8m high face. The smaller EC210B LC is fitted with a hydraulic hammer for breaking up the daily blasted rocks that are too big to go into the crusher.

The EC700B LC feeds either one of the dozen 30 and 45tonne Belorussian-made Belaz rigid haulers - or the 39tonne A40E Volvo articulated haulers. The Volvos are proving efficient at removing the overburden, as their underbody heaters dislodge the wet and sticky red/black clay, and avoid 'carry-back'. Despite being oil rich, fuel is not cheap in Russia, so the fuel efficiency of the Volvo machines has also been an important benefit.

For more information on companies in this article

Related Content

  • Rockster machine performing in Turkish quarry
    January 26, 2018
    Crushing equipment from Rockster is playing a key role in the efficient production process at a quarry site in Turkey
  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact
  • Sandvik's QE440 makes its debut
    April 4, 2012
    Sandvik Mining and Construction's latest development in mobile scalping, the QE440, has been developed to cater for the serious aggregate producer, says the company.
  • Sandvik's QE440 makes its debut
    February 6, 2012
    Sandvik Mining and Construction's latest development in mobile scalping, the QE440, has been developed to cater for the serious aggregate producer, says the company.