Skip to main content

Upgrade for Russian quarry

In Russia, the Ministry for Industry established the Gurovo Beton quarry in the Tula region south of Moscow in 1951.
February 22, 2012 Read time: 2 mins
RSSIn Russia, the Ministry for Industry established the Gurovo Beton quarry in the Tula region south of Moscow in 1951. The 1960s and 1970s were periods of boom for the quarry but the late 1990s saw severe recession in Russia, with limestone output falling to very low levels. In 2006 2551 HeidelbergCement acquired a majority stake in the company and the whole quarry is being modernised. In addition to a new Austrian crusher, a Chinese cement plant has been built, new conveyors installed and offices upgraded. But key to its long term success is a comprehensive modernisation of the quarry's mobile machinery. A new fleet of 2394 Volvo equipment has arrived, comprising wheel loaders (L90E, L110F, L150F, three L220F and L220E), an EC210Blc excavator, an EC700B LC excavator - and three A40E articulated haulers.

These new machines are not replacing older machines but are fundamentally changing the way the quarry works. One of the biggest problems the quarry faces is how to remove the extremely thick overburden covering the limestone, which ranges from 40 to over 50m thick. In the past the quarry has used an old and unreliable high voltage electric powered excavator, which cut away at a face 11m high.

The electric excavators will be replaced over the next year by Volvo's 70tonne excavator, fitted with a 5m³ bucket and cutting at a smaller 8m high face. The smaller EC210B LC is fitted with a hydraulic hammer for breaking up the daily blasted rocks that are too big to go into the crusher.

The EC700B LC feeds either one of the dozen 30 and 45tonne Belorussian-made Belaz rigid haulers - or the 39tonne A40E Volvo articulated haulers. The Volvos are proving efficient at removing the overburden, as their underbody heaters dislodge the wet and sticky red/black clay, and avoid 'carry-back'. Despite being oil rich, fuel is not cheap in Russia, so the fuel efficiency of the Volvo machines has also been an important benefit.

For more information on companies in this article

Related Content

  • New crusher for Russian quarry upgrade
    May 5, 2015
    The largest marble quarry in Russia is now benefiting from the first CI512 Prisec HSI crusher in the country. The machine is working at the Koelga Quarry, the largest Russian marble quarry, and one of the world’s largest. Supplied by Sandvik’s Russian distributor, Quarry Service, the CI512 Prisec operates 24 hours/day and the machine has improved the cubicity of the end product and boosted productivity by up to 50%, while decreasing noise emissions. Koelga Marble is Russia’s market leader in the prod
  • TSL Contractors in the UK adds more Volvos to its fleet
    October 16, 2015
    In the Scottish highland Isle of Mull, TSL Contractors has made a significant purchase of Volvo Construction Equipment products only a year after buying its first Volvo excavator. The company, based in the town of Craignure, will use the machines for building roads as part of the business’s many hydroelectric contracts. New machinery includes 14tonne EC140D excavators, three 22tonne EC220E and one EC300 30tonne excavators, as well as two A25G articulated haulers. TSL managing director Andrew Knight sa
  • New bypass for Meghalaya, India
    November 21, 2014
    A new two-lane road has been built in Meghalaya, India, providing a challenging project for the construction team The new road lies at a comparatively high altitude and provides a bypass around Shillong, the capital of Meghalaya and which is one of the smallest states in India. Shillong is located 1,496m above sea level, with the highest point being Shillong Peak at almost 2,000m, and the area has a much cooler climate than the rest of tropical India. Shillong is also only 55km away from Mawsynram, which is
  • English quarry opts for MDS trommels
    March 22, 2016
    Gallagher Aggregates’ Hermitage Quarry, near Maidstone in south-east England, has purchased two MDS trommels from recently appointed distributor Blue Machinery London. The 155tonne M820, is one of the world’s largest tracked mobile trommels. It is joined on site by the smaller 50tonne M515. Both models are fully mobile on crawler undercarriage and feature hydraulic folding stockpiling conveyors for quick set-up once in position. The M515 is producing fines (-120mm), which fall through the initial holes i