Skip to main content

Tsurumi at the centre of €1.7billion tunnel project in Sweden

Tsurumi has provided six pumps to a major inner city underground tunnel initiative to connect two central islands in Stockholm, Sweden. The LH series high head dewatering pumps being used in Söderström tunnel were added to the project to replace another manufacturer’s pumps following delays. The pumps are positioned 28metres underwater in drilled holes just 200mm wide and are said to be a vital part of the ambitious works, connecting the islands of Södermalm and Riddarholmen. The 300metre long submerged sec
June 13, 2012 Read time: 2 mins
Six LH23.0W pumps, like the one pictured, from Japan-based Tsurumi is being used in the Söderström tunnel project in Stockholm, Sweden
2357 Tsurumi Pump has provided six pumps to a major inner city underground tunnel initiative to connect two central islands in Stockholm, Sweden.

The LH series high head dewatering pumps being used in Söderström tunnel were added to the project to replace another manufacturer’s pumps following delays.

The pumps are positioned 28metres underwater in drilled holes just 200mm wide and are said to be a vital part of the ambitious works, connecting the islands of Södermalm and Riddarholmen.

The 300metre long submerged section of the Söderström tunnel is being built using immersed tunnel sections. These are supported on four grouped piles that have been drilled into the bedrock. This means the tunnel is resting on an underwater bridge.

The submerged tunnel consists of three 100metre long prefabricated sections. The sections contain two tubes that will each carry a 12metre wide railway track and a 5metre wide access tunnel for service and rescue.

Deep channels have been excavated on both sides of the Söderström bay. In these channels the contractor is using the ‘cut and cover’ construction method to connect the underwater and under bedrock tunnel sections. At a depth of 20metres these excavated channels, which have retaining walls held in place by 1.5m wide piles, are the deepest ever used in northern Europe.

The six LH23.0W pumps from Japan-based Tsurumi are being used for dewatering during the complicated installation of submerged tunnel sections at the project. The pumps were said to be chosen for their reliability and powerful capabilities, as well as their compact design.

Work began on the Söderström tunnel project in May 2008 and should be completed by the end of 2012. The project is being managed by JV Söderström tunnel HB, a joint venture between contractors Züblin Scandinavia AB and E. Pihl & Søn A.S.

For more information on companies in this article

Related Content

  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Fehmarnbelt hearings to start
    September 24, 2020
    The Danish-German project has come under financial and environmental criticism.