Skip to main content

Short tailswing excavator gains access

In Germany a short tailswing excavator from Doosan has carried out a tricky demolition project. The DX235LCR machine was used to demolish an old residential property, located in close proximity to a road. Belgian demolition contractor Klaus Anthes was brought in to carry out the work in Eppstein in Germany, and used the 24tonne excavator for the job. The work was tricky as the house was located on the side of a hill and also next to a narrow road. However traffic could not be disturbed so the machine had to
November 29, 2012 Read time: 2 mins
The reduced radius Doosan excavator was able to demolish a property without disturbing traffic on the narrow road next to it
In Germany a short tailswing excavator from 695 Doosan has carried out a tricky demolition project. The DX235LCR machine was used to demolish an old residential property, located in close proximity to a road. Belgian demolition contractor Klaus Anthes was brought in to carry out the work in Eppstein in Germany, and used the 24tonne excavator for the job.

The work was tricky as the house was located on the side of a hill and also next to a narrow road. However traffic could not be disturbed so the machine had to work within the boundary of the property. Meanwhile the existing natural stone cellar had to be left in place as this was to provide the base for the new property planned for the site, while the garden to the rear also had to be left as this is in a protected natural area.

The contractor rented the excavator along with a sorting grapple from 1130 Bobcat Bensheim. The 24tonne excavator was useful for this project as it features a short radius design with only 185mm of overhang and a swing diameter of just 3.99m, allowing the contractor to work in confined spaces. Reach and stability were also important, to allow the machine to work on the slope.

For more information on companies in this article

Related Content

  • Liebherr’s 47 M5 XXT Truck-Mounted Concrete Pump
    December 4, 2013
    Liebherr claims its updated 47 M5 XXT truck-mounted concrete pump offers added customer value. In-house development and optimisation of the mast is said to have been at the forefront of the latest model version. An array of other new design features will, says Liebherr, simplify the replacement of wear parts for more efficient servicing.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes