Skip to main content

SDLG wheeled loaders helping build infrastructure in Indonesia

Wheeled loaders from SDLG are helping build transport infrastructure in Indonesia, including new tolled highway routes. The machines are helping to ensure a steady supply of raw building materials for the Belt and Road Initiative (BRI). Indonesia is the largest economy in South East Asia and is a key node in the BRI. The country will receive more than US$87 billion in infrastructure investment under the BRI, with the Manado-Bitung toll road amongst the high-profile projects. With land acquisition tro
August 12, 2019 Read time: 2 mins
SDLG wheeled loaders are playing an important role in developing Indonesia’s road network
Wheeled loaders from 5316 SDLG are helping build transport infrastructure in Indonesia, including new tolled highway routes. The machines are helping to ensure a steady supply of raw building materials for the Belt and Road Initiative (BRI).


Indonesia is the largest economy in South East Asia and is a key node in the BRI. The country will receive more than US$87 billion in infrastructure investment under the BRI, with the Manado-Bitung toll road amongst the high-profile projects.

With land acquisition troubles causing delays, there is pressure to ensure that construction proceeds efficiently. The steady and reliable supply of materials, such as aggregates, asphalt and concrete, plays a vital role.

SDLG-branded models have become popular in recent years as they suit the high-cycle, low-complexity nature of loading, unloading and shuttling back-and-forth between locations on a job site.   

Hot mix asphalt supplier PT Roadmixindo Raya, construction company PT Hutama Karya, and concrete producer PT Varia Usaha Beton are amongst the companies that have selected SDLG wheeled loaders.

The SDLG wheeled loaders working for these customers handle from 500-5,000m3 of material/day, involving multiple trips so a fast cycle time is critical.

PT Roadmixindo Raya has said that SDLG L958F wheeled loaders have helped reduce cycle times at its Tangerang site, due to the eight-speed transmissions. The operating cycle involves moving 20-250m between the stockpiles of aggregates and the cold feed bins of the asphalt mix plant. Meanwhile, PT Varia Usaha Beton says that the good power to weight ration for the L956F model allows it to handle the 15° slopes around its crushing plant in Pasuruan.

For more information on companies in this article

Related Content

  • SDLG unveils new concept excavator and wheeled loader
    January 6, 2017
    SDLG has lifted the covers on two new concept machines it has developed, a wheeled loader and an excavator. These models represent a major development for SDLG as they will compete in larger equipment classes than current models from the firm. Both the excavator and the wheeled loader will suit duties in heavy duty equipment segments such as quarrying, where reliability and durability are crucial to deliver maximum utilisation. High productivity is also claimed, along with good all round visibility and a co
  • Innovations in plant development
    September 19, 2024
    Several of the major manufacturers are offering key innovations for the asphalt plant segment – Mike Woof writes
  • Increased use of reclaimed asphalt, reduced emissions
    February 10, 2012
    Reducing emissions and increasing the use of reclaimed asphalt pavement is among the key aims of plant manufacturers. Patrick Smith reports. Lower emissions and the use of recycled materials coupled with reduced costs are the aims of manufacturers of modern asphalt plants.
  • Mobile plant provides asphalt answer at airport
    September 30, 2013
    The project to upgrade Kassel-Calden Airport in Germany is providing a much improved facility. Opened in 1970, the original airport had a short runway that was not suited to predicted traffic volumes and current standards so a complete reconstruction of the facility has been carried out. The €271 million investment in the facility is expected by the developers to provide a strong economic benefit to the area. The original airport was built on an area of over 200ha and a new and longer runway has been con