Skip to main content

SDLG wheeled loader carries out loading efficiently

A wheeled loader from SDLG has been showing its reliability and productivity at an Oman aggregates plant. The Naeem Dhofar Trading Company is a specialist in sand and aggregate production. Since spring 2015, it has been crushing wadi rock at its purpose-built facility located at Wadi Dahboon, around 100km north of Salalah, Oman. Around 1,530m3 of rocks are delivered to the site/day, of which around 3,000tonnes are crushed and screened in a single 10-hour shift. From this, a range of products are produced,
October 5, 2018 Read time: 2 mins
The SDLG wheeled loader has performed productively in the difficult working conditions
A wheeled loader from 5316 SDLG has been showing its reliability and productivity at an Oman aggregates plant. The Naeem Dhofar Trading Company is a specialist in sand and aggregate production. Since spring 2015, it has been crushing wadi rock at its purpose-built facility located at Wadi Dahboon, around 100km north of Salalah, Oman.


Around 1,530m3 of rocks are delivered to the site/day, of which around 3,000tonnes are crushed and screened in a single 10-hour shift. From this, a range of products are produced, from natural wadi sand to aggregates as large as 20mm, and they are used in ready-mix, road building and general construction sectors in the Sultanate. Naeem Dhofar decided to purchase an SDLG L958F wheeled loader to handle the bulk of the heavy lifting.

Plant engineer Devanand Bugde explained that the Wadi stone is a particularly harsh material, and one that places demands on equipment. In addition, summertime temperatures can top 40°C and combined with the crusher dust, it makes the working environment demanding.

For the future, Bugde said Naeem Dhofar plans to expand its capacity, as well as develop its own ready-mix capability.

For more information on companies in this article

Related Content

  • SDLG wheeled loaders assisting in Georgia’s concrete production
    December 8, 2014
    A fleet of wheeled loaders from SDLG is playing a key link in the chain for producing concrete at a facility in Georgia. With this equipment HeidelbergCement Georgia and HeidelbergBeton Georgia are proving able to keep pace with an intensive production schedule at a number of concrete production sites across Georgia. Overall HeidelbergCement Caucasus has seven concrete and two cement manufacturing plants in Georgia that are running SDLG wheeled loaders. The company’s SDLG fleet comprises LG936L, LG953 a
  • Long hours in Yorkshire, UK, for Doosan’s latest machines
    August 21, 2015
    Heavy-duty quarry work is the order of the day for new Doosan DX420LC-3 and DX340LC-3 crawler excavators, together with two new DL550-3 and three new DL420-3 wheel loaders. Wentvalley Aggregates & Recycling in county Yorkshire in the UK purchased the machines for its Wentbridge site where they work alongside other generation machines, the Doosan DL450 wheel loader and Doosan DX225LC excavator. The quarry supplies limestone products, including single-size and all primary blended products from crusher runs
  • SDLG wheeled loaders assisting in Georgia’s concrete production
    March 13, 2015
    A fleet of wheeled loaders from SDLG is playing a key link in the chain for producing concrete at a facility in Georgia. With this equipment HeidelbergCement Georgia and HeidelbergBeton Georgia are proving able to keep pace with an intensive production schedule at a number of concrete production sites across Georgia. Overall HeidelbergCement Caucasus has seven concrete and two cement manufacturing plants in Georgia that are running SDLG wheeled loaders. The company’s SDLG fleet comprises LG936L, LG953 and L
  • Russian quarry increases efficiency with Sandvik equipment
    August 20, 2015
    A quarry facility in Russia has increased working efficiency by using Sandvik machinery. Located in in the Kurgan Region (Urals) of Russia, the Sinarsky Quarry is benefiting from an increase in throughput and reduced downtime since its new Sandvik crushing and screening plant became fully operational. The company invested over €2 million on the new plant, and is aiming to use it in order to double its aggregates production. This increase in production is required in order to meet the doubling of demand for