Skip to main content

Saudi Arabia limestone production boost

Saudi Dolomite runs a processing plant in Abqaiq, which is located in the desert, 80km south-west of the capital of the eastern province of Saudi Arabia, Damman. Covering an area of 250,000m², the plant processes 5,000tonnes of material/day and runs its around-the-clock operation seven days/week.
October 23, 2017 Read time: 2 mins
Volvo wheeled loaders are used for material handling and loading duties across the site.
Saudi Dolomite runs a processing plant in Abqaiq, which is located in the desert, 80km south-west of the capital of the eastern province of Saudi Arabia, Damman.


Covering an area of 250,000m², the plant processes 5,000tonnes of material/day and runs its around-the-clock operation seven days/week.

359 Volvo CE wheeled loaders are helping increase productivity at a processing plant in Saudi Arabia. And the firm has long relied on machines from Volvo CE to help in production. “We have a long relationship with Volvo,” says Ali Al Mubarak, managing director at Saudi Dolomite. “We started out with two small BM wheeled loaders over 30 years ago and due to their uptime and reliability, in what are really harsh conditions, I’d say we have grown this business together.”

Saudi Dolomite’s crushing and calcination plant produces lime (pure calcium oxide) and dolime (calcium oxide with magnesium content) from limestone rock found in the two quarries it sub-contracts. Volvo BM L150 and Volvo L180F wheeled loaders are used for material handling and loading duties across the site.

Required to work 12-hour shifts, the machines have passed the 50,000 hours mark. Saudi Dolomite also operates 35 Volvo on-highway trucks for shipping in addition to wheeled loaders. The machines were supplied by FAMCO, Volvo CE’s dealer in the region, which also provides the service that helps ensure the uptime needed.

Related Content

  • UAE mountain road construction complete
    January 5, 2017
    An eight year project to construct the highest road in the UAE is now complete, with key help having been provided by a fleet of Volvo CE machines The work was carried out by local contractor General Mechanic Company (GMC), with assistance from Volvo CE dealer FAMCO as well as Volvo CE itself and Volvo Trucks. The 36km road climbs 1,910m to its highest point in a mountain range and required the transportation of 5.5 million m3 of materials during its construction.
  • Major producer of road construction materials
    February 10, 2012
    The Simge Group operates a massive and highly modern quarrying operation close to the Turkish city of Bursan, which provides a major supply of aggregates and asphalt to the country's highway construction sector. This quarry produces around 4 million tonnes/year of crushed limestone and is the largest of the five quarries the Simge Group runs in Turkey, which have a combined output of 12 million tonnes/year. The huge site has an asphalt output of 500,000tonnes/year, again a significant portion of the 1.2 mil
  • Prototype electric wheeled loader from Volvo CE
    September 13, 2018
    Volvo CE is continuing its development of sophisticated zero emission machines and is now unveiling a prototype wheeled loader with all-electric drive. The firm recently demonstrated its LX2 electric compact wheel loader at the Volvo Group Innovation Summit in Berlin. The prototype machine delivers zero emissions, significantly lower noise levels, improved efficiency and reduced operational costs. At the summit, Volvo CE also demonstrated its EX2 fully-electric compact excavator prototype and presented the
  • Volvo CE’s Carl Slotte explains the division’s current line-up
    October 11, 2017
    Next year Volvo CE will be testing electric, hybrid and autonomous vehicles in a quarry. Carl Slotte, head of sales for EMEA, says no company by itself will win market share. David Arminas reports from Germany The driver of the charter bus stood outside the hotel in Trier, Germany, and waved at a passing local city bus. “I know the driver,” he told one of the assembled journalists waiting for the group’s ride to the nearby Volvo CE plant. “He is retired but they brought him back because young people th