Skip to main content

R960 demolition machine makes Intermat debut

Liebherr has taken the wraps off the R960 demolition rig, a 93.5 tonne crawler with a choice of 28m and 34m boom configurations. A replacement for the previous R954C, the R960 is powered by a 240kW Stage IV diesel engine and features the latest Liebherr Demolition Control (LDC) active safety system.
January 6, 2017 Read time: 1 min
Demolition model shows revised control system

718 Liebherr has taken the wraps off the R960 demolition rig, a 93.5 tonne crawler with a choice of 28m and 34m boom configurations. A replacement for the previous R954C, the R960 is powered by a 240kW Stage IV diesel engine and features the latest Liebherr Demolition Control (LDC) active safety system. This system provides the operator with a graphic image of the machine’s tilt angle and tool position. Capable of handling attachments weighing up to 3.5 tonnes, the R960 demolition was awarded the silver Intermat innovation prize for 2015, in the Engineering and Systems category.

For more information on companies in this article

Related Content

  • Novel demolition machines
    May 9, 2023
    The market for ruggedised demolition excavators has very specific requirements, with three new models now available – Mike Woof writes
  • New demolition excavators
    April 29, 2025
    Extended reach excavators offers versatility for demolition works, with new models now available
  • Long reach versatility for demolition
    July 16, 2020
    Caterpillar is now offering its versatile 352 UHD Ultra High Demolition Excavator. The machine can be used for demolition works at height, as well as for long reach earthmoving applications.
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.