Skip to main content

Quarry producer

A powerful Hitachi excavator is being used to maximise efficiency and simplify the extraction process at a Polish limestone quarry. The operation is owned by Cementownia Warta and since it purchased its EX1200-6, annual production in the Dzialoszyn limestone quarry has risen to 2.5 million tonnes.
February 20, 2012 Read time: 2 mins
The first batch of new generation ZW wheeled loaders from Hitachi sold to Italy are now hard at work in the company's quarrying industry
A powerful 233 Hitachi excavator is being used to maximise efficiency and simplify the extraction process at a Polish limestone quarry. The operation is owned by Cementownia Warta and since it purchased its EX1200-6, annual production in the Dzialoszyn limestone quarry has risen to 2.5 million tonnes. The 200ha quarry is one of the largest in Poland and needed to boost limestone production rates in order to meet production targets of 3,000tonnes of cement/day. Employing the Hitachi equipment helped make this possible. Before the EX1200-6 arrived, the firm was blasting once/day and using smaller electric excavators to load material into its dump truck fleet. However, the larger EX1200-6 is able to extract material without the need for blasting in every instance and this is also better for the local environment as it features underground water.

Meanwhile Italy's Hitachi dealer in Italy, SCAI, has delivered the first batch of new large wheel loaders to customers in the quarrying industry. The ZW330, ZW370 and ZW550 models are the result of an alliance between Hitachi Construction Machinery (HCM), 2832 Kawasaki Heavy Industries and 2833 TCM Corporation.

The first ZW550 was supplied by the dealer's Massa Carrara branch to FB Cave, a subsidiary of Furrer, which operates a mountain-top marble quarry in Betogli, near Carrara.

The ZW550 is used in all parts of the extraction process. It removes small rocks placed beneath large blocks of marble that are extracted by a Hitachi EX800H excavator. It can also be used with a fork attachment to transport the blocks around the site and load trucks for transporting the high-quality marble to Furrer's factory in nearby Avenza.

For more information on companies in this article

Related Content

  • Australia’s new airport in Queensland
    August 18, 2015
    The first new airport constructed in Australia for 45 years is now open for business. The Brisbane West Wellcamp Airport in Queensland is located 17km to the west of Toowomba. The facility was completed at the end of last year by Wagners, an Australian family-owned construction company. Toowoomba lies in the Darling Downs region of Queensland, located 126km west of Queensland’s capital city, Brisbane. Toowoomba’s population of approximately 165,000 makes it Australia’s second-most populous inland city. T
  • English quarry opts for MDS trommels
    March 22, 2016
    Gallagher Aggregates’ Hermitage Quarry, near Maidstone in south-east England, has purchased two MDS trommels from recently appointed distributor Blue Machinery London. The 155tonne M820, is one of the world’s largest tracked mobile trommels. It is joined on site by the smaller 50tonne M515. Both models are fully mobile on crawler undercarriage and feature hydraulic folding stockpiling conveyors for quick set-up once in position. The M515 is producing fines (-120mm), which fall through the initial holes i
  • Effective dust control
    February 13, 2012
    Dealing with nuisance dust is an issue for almost every quarry and for those operating in the tropical paradise of the Caribbean, it is no different. One Trinidad-based quarry operator has recently tackled the problem and is seeing benefits for its workers, neighbours and its machine service life too.
  • Effective dust control
    April 12, 2012
    Dealing with nuisance dust is an issue for almost every quarry and for those operating in the tropical paradise of the Caribbean, it is no different. One Trinidad-based quarry operator has recently tackled the problem and is seeing benefits for its workers, neighbours and its machine service life too. Trinidad Cement Limited (TCL) extracts around 1.1million tonnes of limestone each year from its quarry in Mayo, Central Trinidad but had a history of problems with dust. "In the past, our crews had done