Skip to main content

PPP for Danish highway

Construction of the first public-private (PPP) funded highway in Denmark will see a new road in the south of the country near the German border. The Kliplev Motorway Group (KMG) is one half of Denmark's first ever PPP with the government, after winning the tender to build the highway. KMG is financing the whole project and the deal includes construction and ongoing maintenance when it is complete. KMG is the concessionary company for the project and is 100% owned by the Austrian company STRABAG, Europe's la
February 7, 2012 Read time: 3 mins
The low emission and low fuel consumption of the Volvo CE machines has proven useful on this Danish site
Construction of the first public-private (PPP) funded highway in Denmark will see a new road in the south of the country near the German border.

The 2352 Kliplev Motorway Group (KMG) is one half of Denmark's first ever PPP with the government, after winning the tender to build the highway. KMG is financing the whole project and the deal includes construction and ongoing maintenance when it is complete.

KMG is the concessionary company for the project and is 100% owned by the Austrian company 945 Strabag, Europe's largest construction company.

The e126 million, two-year project, is a new way of working in Denmark. However, KMG won the deal by promising to complete the highway by spring 2012, without payment until the work is completed.

The highway will stretch from Kliplev in the south-west to Sønderborg in the south-east, and will connect Sønderborg to major roads such as the E45, which runs the length of the country.

It is building the whole highway at once using a workforce of 350 as well as 200 machines, of which 71 are 2394 Volvo CE units supplied by North German dealer 2353 Baumaschinen Koenicke. The Volvo CE fleet includes 30 Volvo A25E and A35E articulated haulers, 40 EC210 up to EC460 excavators and several L220F wheel loaders.

Fuel use and exhaust emissions are a top priority for KMG and it is believed to be the only highway construction project in Europe to have a CO? balance sheet to monitor diesel consumption. This is updated several times/year and sent to the Danish authorities.

KMG is limiting the amount of fuel needed in site transportation by mixing soil with concrete and chalk in-situ, as a base for the highway. KMG is also using the railway to transport cement and chalk from Hannover in Germany to Padborg in Denmark, which is helping speed construction. From there, materials are driven by truck to the site. Some 120,000tonnes of lime and cement are being moved at a rate of 700/800tonnes/day.

The service set-up includes a washing bay which has never been done before in Denmark. This washes soil from the machines and then separates oil and soil from the water so the water can be re-used to wash the next machine.

For more information on companies in this article

Related Content

  • STRABAG raises 2011 and 2012 outlook
    February 29, 2012
    After a solid first quarter 2011, STRABAG, Central and Eastern Europe’s largest construction company, has raised its outlook for the financial years 2011 and 2012.
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri
  • US RCC paving job carried out with Volvo CE machines
    October 21, 2016
    US contractor Conewago Enterprises is using a paver from Volvo CE to lay a roller-compacted concrete (RCC) surface at the Liberty Trust distribution centre in Shippensburg, Pennsylvania. This facility lies close to Interstate-81, which runs through the Appalachian Mountains from the Canada-US border to Tennessee. This 1,376km route carries heavy truck traffic and as a result, hundreds of distribution warehouses have being constructed along the route of this busy transport corridor. Conewago Enterpris
  • Topcon machine control units take the heat off an Alaskan contractor
    December 4, 2015
    Juniper, spruce, cranberry, cottonwood and rose. Most people think of pine trees and berries amid beautiful country fields. But for one contractor based just below the Arctic Circle in the US state of Alaska, the names represent a successful job completed using machine control. Valley General Construction recently finished a US$350,000 contract for the upgrading of country roads in the local borough of Matanuska-Susitna. The colourful names belong to roads in a heavily wooded residential subdivision located