Skip to main content

PPP for Danish highway

Construction of the first public-private (PPP) funded highway in Denmark will see a new road in the south of the country near the German border. The Kliplev Motorway Group (KMG) is one half of Denmark's first ever PPP with the government, after winning the tender to build the highway. KMG is financing the whole project and the deal includes construction and ongoing maintenance when it is complete. KMG is the concessionary company for the project and is 100% owned by the Austrian company STRABAG, Europe's la
February 7, 2012 Read time: 3 mins
The low emission and low fuel consumption of the Volvo CE machines has proven useful on this Danish site
Construction of the first public-private (PPP) funded highway in Denmark will see a new road in the south of the country near the German border.

The 2352 Kliplev Motorway Group (KMG) is one half of Denmark's first ever PPP with the government, after winning the tender to build the highway. KMG is financing the whole project and the deal includes construction and ongoing maintenance when it is complete.

KMG is the concessionary company for the project and is 100% owned by the Austrian company 945 Strabag, Europe's largest construction company.

The e126 million, two-year project, is a new way of working in Denmark. However, KMG won the deal by promising to complete the highway by spring 2012, without payment until the work is completed.

The highway will stretch from Kliplev in the south-west to Sønderborg in the south-east, and will connect Sønderborg to major roads such as the E45, which runs the length of the country.

It is building the whole highway at once using a workforce of 350 as well as 200 machines, of which 71 are 2394 Volvo CE units supplied by North German dealer 2353 Baumaschinen Koenicke. The Volvo CE fleet includes 30 Volvo A25E and A35E articulated haulers, 40 EC210 up to EC460 excavators and several L220F wheel loaders.

Fuel use and exhaust emissions are a top priority for KMG and it is believed to be the only highway construction project in Europe to have a CO? balance sheet to monitor diesel consumption. This is updated several times/year and sent to the Danish authorities.

KMG is limiting the amount of fuel needed in site transportation by mixing soil with concrete and chalk in-situ, as a base for the highway. KMG is also using the railway to transport cement and chalk from Hannover in Germany to Padborg in Denmark, which is helping speed construction. From there, materials are driven by truck to the site. Some 120,000tonnes of lime and cement are being moved at a rate of 700/800tonnes/day.

The service set-up includes a washing bay which has never been done before in Denmark. This washes soil from the machines and then separates oil and soil from the water so the water can be re-used to wash the next machine.

For more information on companies in this article

Related Content

  • New airport for Papua New Guinea
    August 21, 2013
    A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area. Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall. However the airport was need
  • Nigeria’s Eko Atlantic project: a city on the sea
    September 27, 2013
    Imagine a megapolis rising, Atlantis-like, from the sea. An urban development similar in size to New York’s Manhattan that boasts thriving business and residential districts to help transform not just a city but an entire country. It sounds like the stuff of science fiction. But the Eko Atlantic project in Lagos, Nigeria, is real and has become one of the most dazzling and most discussed construction developments in the entire world. One hundred years ago, the area of land on which the new city will be bu
  • Volvo CE bridging the gap for new Indian transport links
    December 11, 2013
    The old Pakuria Bridge in Jharkhand, India, ran over a dry riverbed and railway line situated 20km from Calcutta. Now obsolete, the bridge has been brought to the ground in 60 days using Volvo construction equipment West Bengal in eastern India is the nation’s fourth most populous region, boasting more people than the whole of Germany. The state is bordered by Nepal, Bhutan, Bangladesh, and five other states of India with more than 91 million inhabitants spread over 34,267m².
  • Caution not catastrophe in European market, says Volvo CE EMEA sales boss
    August 14, 2012
    There is caution but no catastrophe in the European construction equipment sales market, according to Volvo Construction Equipment (CE) EMEA sales president Tomas Kuta. Speaking at a press conference to launch Volvo CE’s PL3005D pipelayer, and ahead of the in-port race of the Volvo Ocean Race in Lorient, France, Kuta said: “Europe is not a catastrophe. Our Quarter 1 (2012) results were very much driven by Europe, but it’s the outlook that is so uncertain. “We (Volvo CE) have seen good development in the no