Skip to main content

Powerful underground drill rig

The new Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009. The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN).
February 24, 2012 Read time: 2 mins
The new DE150: Sandvik's most powerful drill rig for underground exploration
The new 325 Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009.

The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN). Depth capacity is up to 2,000m (NQ rods), and in underground applications the DE150 is powered by a 110 kW electric power unit giving a maximum working pressure of 250 bar and oil flow of 300litres/min.

For surface application the DE150 can be powered by a diesel engine. The drill unit features a stiff and torsion resistant steel profile feed boom and a direct coupled feed cylinder with a feed length of 1,700mm and feed speed of maximum 0.63m/sec. The feed boom is mounted on a frame with tilt cylinder and mechanical supports, and the mounting frame has been specifically designed for quick and easy set-up when fan drilling with a full range of adjustment from vertical down to vertical up.

The group has also introduced its new Drill Shack for safety, health and environment, and to meet the requirements of Sandvik's DE130 and DE140 diamond core drills.

"This innovative and well thought-out solution makes it possible to operate in arctic or sub- tropical climates and is easily transportable by helicopter, packed in compact units or in its entirety by tracked vehicles or mounted on a hook lift frame," says Sandvik.

"The modular design of the new Drill Shack makes it suitable for both mobile and stationary units with quick assembly/pull down."

For more information on companies in this article

Related Content

  • Pilosio builds up its formwork offering with the flying table ST80
    January 6, 2017
    Pilosio’s new flying table ST80 is ideal for high construction work where pouring cycles repeat from one level to another. Flying forms are constituted by large sections of formwork, featuring supporting trusses, joists and aluminum posts. This system is used to cast slab areas with tables that can be designed in order to reach up to lengths of 30m and widths of 6m. The system enhances also side flaps in order to handle spaces between columns and slab edges.
  • Ambitious road tunnelling projects around the world
    November 29, 2013
    The construction of the world’s longest subsea road tunnel in Norway and a vital new link under the Bosphorus Strait in Turkey are among a host of exciting, major road tunnel-based projects currently being undertaken across the globe. Guy Woodford reports Sandvik DTi series tunnelling jumbos are being used for the excavation of Solbakktunnel, set to become the world’s longest subsea road tunnel.
  • New Kleemann impactors are Tier 4 Final-compliant
    January 6, 2017
    Kleemann has launched two new impact crushers, the Mobirex MR 110 ZSi EVO 2 and MR 130 Zi EVO 2. “EVO 2 represents the continuing evolution of the successful EVO Contractor Line, with additional benefits in terms of economy and operational safety,” said Mark Hezinger, marketing manager. The new impact crushers are differentiated by their size and productivity with the MR 110 ZSi EVO 2 having a crusher inlet opening of 1,100mm, and the MR 130 Zi EVO 2 a crusher inlet opening of 1,300mm. These provide feed
  • Case lightens French traffic
    February 18, 2013
    Two new Case CX series excavators played a leading role in a major €1.5 million project to improve traffic flow at the Terres Saint Jean business and shopping park in Épinal, eastern France. Purchased by French firm Peduzzi TP, the CX250C and a CX350C machines are helping to renew the infrastructure, improve traffic flow and safety at the junction with the RN 57. The Épinal town council commissioned works, which began in March 2012, included the construction of an underground passage under the RN 57 linking