Skip to main content

Powerful underground drill rig

The new Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009. The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN).
February 24, 2012 Read time: 2 mins
The new DE150: Sandvik's most powerful drill rig for underground exploration
The new 325 Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009.

The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN). Depth capacity is up to 2,000m (NQ rods), and in underground applications the DE150 is powered by a 110 kW electric power unit giving a maximum working pressure of 250 bar and oil flow of 300litres/min.

For surface application the DE150 can be powered by a diesel engine. The drill unit features a stiff and torsion resistant steel profile feed boom and a direct coupled feed cylinder with a feed length of 1,700mm and feed speed of maximum 0.63m/sec. The feed boom is mounted on a frame with tilt cylinder and mechanical supports, and the mounting frame has been specifically designed for quick and easy set-up when fan drilling with a full range of adjustment from vertical down to vertical up.

The group has also introduced its new Drill Shack for safety, health and environment, and to meet the requirements of Sandvik's DE130 and DE140 diamond core drills.

"This innovative and well thought-out solution makes it possible to operate in arctic or sub- tropical climates and is easily transportable by helicopter, packed in compact units or in its entirety by tracked vehicles or mounted on a hook lift frame," says Sandvik.

"The modular design of the new Drill Shack makes it suitable for both mobile and stationary units with quick assembly/pull down."

For more information on companies in this article

Related Content

  • Pilosio improves SlabProp range with the SlabProp 2.0
    July 8, 2016
    As part of upgrades to the SlabProp range from Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031). Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity. This prop is made of aluminium type 6005A for a good ca
  • BOMAG’s new asphalt paver range
    June 23, 2021
    BOMAG is launching its new range of asphalt pavers, which benefit from the latest technology. The new generation of universal and highway class pavers from BOMAG are equipped with the company’s Advanced Pave system, a digital co-pilot for pavers
  • Bauer and Europe’s deepest underground parking garage
    July 7, 2016
    BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland. Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of