Skip to main content

Powerful underground drill rig

The new Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009. The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN).
February 24, 2012 Read time: 2 mins
The new DE150: Sandvik's most powerful drill rig for underground exploration
The new 325 Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009.

The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN). Depth capacity is up to 2,000m (NQ rods), and in underground applications the DE150 is powered by a 110 kW electric power unit giving a maximum working pressure of 250 bar and oil flow of 300litres/min.

For surface application the DE150 can be powered by a diesel engine. The drill unit features a stiff and torsion resistant steel profile feed boom and a direct coupled feed cylinder with a feed length of 1,700mm and feed speed of maximum 0.63m/sec. The feed boom is mounted on a frame with tilt cylinder and mechanical supports, and the mounting frame has been specifically designed for quick and easy set-up when fan drilling with a full range of adjustment from vertical down to vertical up.

The group has also introduced its new Drill Shack for safety, health and environment, and to meet the requirements of Sandvik's DE130 and DE140 diamond core drills.

"This innovative and well thought-out solution makes it possible to operate in arctic or sub- tropical climates and is easily transportable by helicopter, packed in compact units or in its entirety by tracked vehicles or mounted on a hook lift frame," says Sandvik.

"The modular design of the new Drill Shack makes it suitable for both mobile and stationary units with quick assembly/pull down."

For more information on companies in this article

Related Content

  • Dressta increases dozer application range
    January 6, 2017
    Dressta is increasing the application range of its well-proven bulldozer designs with the introduction of new models for specific duties. The company claims that these variants represent Dressta’s customer-focused approach to manufacturing construction equipment. The firm has considerable experience in specifying its machines for different, and in some cases particularly arduous, machine applications. The range of customer-specific variations include optimal equipment configuration to adapt the machines to
  • Cat unveils the well-drilled MD5150C
    May 22, 2014
    Caterpillar’s new MD5150C Track Drill, the first of the C Series drills, delivers claimed top-of-class power and high airflow for fast, efficient drilling of holes from 101.6mm to 152mm in diameter. The MD5150C offers a choice of three different rock drills, patented carousel rod changer, ergonomic cab and many other features that boost productivity and reduce operating costs.
  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un