Skip to main content

Piling on the power

Liebherr's new LB Series rotary drilling rigs are designed for operations using Kelly equipment, continuous flight augers and double rotary heads. These can be used in an array of ground stabilisation applications for construction projects and complement the firm's proven LRB range of combined piling and drilling machines. There are four models in the new LB range, with operating weights from 68.4-113.5tonnes and these are capable of drilling diameters from 1.2-2.5m and to depths from 35-70m using Kelly equ
July 20, 2012 Read time: 1 min
718 Liebherr's new LB Series rotary drilling rigs are designed for operations using Kelly equipment, continuous flight augers and double rotary heads. These can be used in an array of ground stabilisation applications for construction projects and complement the firm's proven LRB range of combined piling and drilling machines. There are four models in the new LB range, with operating weights from 68.4-113.5tonnes and these are capable of drilling diameters from 1.2-2.5m and to depths from 35-70m using Kelly equipment. The powerful LB28 offers a maximum torque of 280 kNm and features a rope descent system with a 40tonne retraction force. The machines are said to be stable in operation and can be transported in a single unit. Where transport restrictions apply, the leader features a quick-assembly system to minimise set-up time on-site.

For more information on companies in this article

Related Content

  • Soilmec’s compact piling rig works in tight spots
    January 6, 2017
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Piling rig performs in difficult conditions
    April 13, 2012
    Specialist contractor Implenia Bau recently carried out some piling work for main contractor Keller Bauunternehmung on a project at Rorsach in Switzerland. The work involved the construction of a secant pile wall as part of a project to build the Raiffeisenbank, located next to a key road. The company opted to use a Liebherr LB28 piling rig equipped with a DBA200 rotary head. The specifications required the installation of 3,000 linear metres of piles to form a secant drilled pile wall within 10 weeks. The
  • Piling rig performs in difficult conditions
    February 28, 2012
    Specialist contractor Implenia Bau recently carried out some piling work for main contractor Keller Bauunternehmung on a project at Rorsach in Switzerland.
  • Green running for Soilmec’s Blue Tech SR-75
    June 26, 2020
    More power but less fuel consumption is a key environmental feature of Soilmec’s SR-75 piling rig, the latest addition to the company’s Blue Tech line. Alongside increased transportability, the SR-75 decreases fuel consumption with its Tier 4 final engine to provide cutting-edge rig control and remote monitoring with DMS (distributed monitoring system).