Skip to main content

Peri climbs high at INTERMAT 2015 with its civil engineering technology

Peri’s Variokit heavy-duty truss girder system has been designed specifically for tunnel and bridge construction to reach those hard-to-get places. The heavy-duty truss girder complements the Variokit heavy-duty shoring tower. Peri took into account the load-bearing capacity of the tower as well as the challenging requirements of everyday construction work.
April 24, 2015 Read time: 1 min

298 Peri’s Variokit heavy-duty truss girder system has been designed specifically for tunnel and bridge construction to reach those hard-to-get places.

The heavy-duty truss girder complements the Variokit heavy-duty shoring tower. Peri took into account the load-bearing capacity of the tower as well as the challenging requirements of everyday construction work.

The high-load modular lattice system can be used for spans up to 40m. With the continuously
adjustable telescopic support frame, all spans can be created with centimetre precision.

In addition, the calotte bearing allows easy adaption to the longitudinal and lateral inclinations of the superstructure. The heavy-duty truss girder can be quickly assembled by means of fitting pins. The optional PERI UP scaffolding in the bottom section provides completely safe working conditions.

For more information on companies in this article

Related Content

  • Riga's newest bridge improved traffic flow
    April 11, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List.
  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.
  • UK’s Liston Group brings a Volvo EC380E high reach machine
    April 10, 2017
    UK demolition contractor Liston Group’s latest fleet addition is a 51tonne Volvo EC380E high reach machine. The EC380E takes over from an EC360D high reach and is working alongside Volvo 25tonne excavators rigged for secondary demolition duties. Reliability and performance of the EC360D high reach machine played a role in the choice of the newer machine, which has the extra reach, designated by the ‘E’, said Liston’s managing director Tony McLean. In charge of the new EC380E is operator John Healy
  • Effective crushing and screening key to quality
    February 22, 2012
    Efficient crushing and screening processes help produce quality products, Mike Woof reports. Having an efficient crushing and screening operation is crucial to the cost-effectiveness of a quarry as well as providing the best quality product. The crushing circuit is a key component in any quarry with the right selection of equipment as well as effective maintenance important factors in optimising performance.