Skip to main content

Oscillation compaction advance in the US

A project carried out by LYNCH, one of the leading contractors in the south-east of New England, provided for the placement and compaction of asphalt on a road near Douglas, MA. A BOMAG BW 190 ADO-5 was used on the 3km section being redeveloped; this was assigned to work on the 60mm thick asphalt binder course and the 25mm thick top layer. The special feature of the project was in the application of the WMA process (Warm Mix Asphalt – low-temperature asphalt). In the course of this process, additive is add
October 2, 2018 Read time: 2 mins
A BOMAG oscillation type compactor has proved its worth on a job in the US
A project carried out by LYNCH, one of the leading contractors in the south-east of New England, provided for the placement and compaction of asphalt on a road near Douglas, MA. A 172 BOMAG BW 190 ADO-5 was used on the 3km section being redeveloped; this was assigned to work on the 60mm thick asphalt binder course and the 25mm thick top layer.


The special feature of the project was in the application of the WMA process (Warm Mix Asphalt – low-temperature asphalt). In the course of this process, additive is added to the mixing system which allows the mix to be produced at lower temperatures of around 30-40°. The binder used consisted of hard granite rocks with about 40% recycled and rubber-modified bitumen.

Two tandem rollers from the 10tonne category were used first for the main compaction with double vibration. The BW 190 ADO-5 took over the final tasks as the finish roller. The two passes needed were performed with an ADO drum to seal the surface and improve evenness.  Due to the WMA mix, the time frame for compacting at the construction site may be shorter depending on the weather or transportation route. In such a case, the advantages of the oscillation system come to light as, on the one hand, it offers more reserves for sensitive rolling of asphalt and, on the other hand, it has great potential for compaction with vibration that can be used at the right time. The BW 190 ADO-5 was able to demonstrate this impressively in Douglas, as upon completion of the project the maximum theoretical density was between 93.4 and 93.8%.

For more information on companies in this article

Related Content

  • Innovative advances in warm Mix Asphalts
    February 1, 2013
    Rising energy costs and increased awareness of safety and environmental issues have encouraged the development of Warm Mix Asphalts (WMA), which are typically produced at temperatures of between 130°C and 145°C, compared with around 175°C for traditional Hot Mix Asphalt (HMA). WMAs are regularly used in many European countries, as well as both North and South America. The three most common ways to lower the working temperature of asphalt are: a) foaming technologies; b) wax additives; and c) chemical (surfa
  • Compaction machine innovations available
    August 5, 2022
    Major manufacturers are offering a range of new compaction machines and technology to the market
  • Road recycling in Denmark
    May 13, 2024
    A novel approach to road refurbishment has saved time, money and carbon emissions in Denmark, while delivering a quality road surface.
  • Latest bitumen mixes improve roads, reduce noise
    February 14, 2012
    Special bitumen mixes and machines are capable of improving the service life of roads and reducing noise. Mike Woof and Patrick Smith report. The need to improve traffic flow in an important part of the City of Poznan, Poland, led to the decision to build a new 1.13km long dual carriageway.