Skip to main content

No Skyra limit on Hitachi investment return

A substantial investment in new Hitachi Construction Equipment machinery is said to have enhanced productivity for the largest aggregates quarry in Cyprus. The Skyra Lima Public Ltd site relies on Hitachi ZW wheeled loaders – supplied by Cypriot Hitachi dealer Unitrak Machinery Ltd – to cope with the tough conditions on the Mediterranean island. The 40-hectare quarry is situated beside the Stavrovouni Monastery – located on the mountain peak of the same name – near the villages of Kornos and Pyrga. It was i
October 30, 2012 Read time: 3 mins
A substantial investment in new 233 Hitachi Construction Equipment machinery is said to have enhanced productivity for the largest aggregates quarry in Cyprus. The Skyra Lima Public Ltd site relies on Hitachi ZW wheeled loaders – supplied by Cypriot Hitachi dealer Unitrak Machinery Ltd – to cope with the tough conditions on the Mediterranean island.

The 40-hectare quarry is situated beside the Stavrovouni Monastery – located on the mountain peak of the same name – near the villages of Kornos and Pyrga. It was initiated in 1960 and bought by Skyra Lima Public Ltd 14 years later. Skyra Lima was taken over by the Iacovou Group in 2006 and since then it has made some significant changes to the management of the diabase quarry. These have included the introduction of a primary crusher, a mobile crusher, six trucks and a Hitachi ZW550 wheeled loader. The new equipment is said to have helped to almost double production from  1.2million to 2million tonnes per annum within two years.

“We blast the rock four or five times a week with a mix of dynamite and ANFO,” said Skyra Lima’s quarry manager, Iakovos Stefanou. “The ZW550 is then used to load five of our trucks, which transport the materials over a distance of 1.5km and dump them into the primary crusher. This feeds two production plants, which have three and five cone crushers respectively.” Both production facilities output the same grades of aggregates: 0-4, 4-10, 8-20 and 10- 14mm for the asphalt and concrete markets; and 0-32, 10-32 and 0-70mm of sub-base for road construction sites. The company’s asphalt and concrete customers are also described as its largest, and they collect the materials directly from the quarry.

Skyra Lima’s second Hitachi wheeled loader, a ZW310, loads the constant stream of trucks that arrive in the stockyard from early morning. The 41-strong team work from 7am until 3pm in the quarry, and in two shifts, from 7am to 3pm and 3 to 9pm, in the production plants.

The ZW310 was delivered in December 2007 and has completed over 10,000 working hours. “It has been operating perfectly and the fuel consumption is also favourable compared to other machines,” said Stefanou.

“The success of the ZW310 led to the purchase of the ZW550 in February 2011. We use the new wheeled loader – rather than a large excavator – for loading the rock, due to its excellent mobility and reduced running costs. It is fast, stable and has a strong chassis – ideal for manoeuvring up and down the 11 benches in the quarry.

“It also has a high penetration force and takes around one minute and 45 seconds to fill each truck. At ten tonnes per pass, this equates to 450 tonnes per hour. The Hitachi wheeled loaders are vital to our operation, as is the maintenance and service supplied by Unitrak.”

For more information on companies in this article

Related Content

  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • Auckland Harbour bridge celebrates 50 years
    April 5, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • New Doosan DL450-5 Wheel Loader is Lynchpin Machine at Tulloch
    September 30, 2016
    Tulloch Developments, a large civil and marine engineering contractor in Shetland, off the north coast of Scotland, has purchased a new Doosan DL450-5 wheeled loader. The machine arrived from the Scottish mainland’s Inverurie-based Balgownie, an authorised Doosan and Bobcat dealer.
  • Sandvik gives Argentine advantage to Canteras Amadeo
    February 20, 2014
    Cutting-edge Sandvik Construction equipment is said to be giving ambitious Argentinian quarry firm Canteras Amadeo a commercial advantage Starting life as a one-quarry enterprise in Córdoba, Argentina, in 1999, Canteras Amadeo is a flourishing business with additional operations in Cordoba and Santiago del Estero. Key to its success is said to be its owners’ embrace of technological improvement, and their choice of Sandvik equipment to improve their processes.