Skip to main content

New breaker from Atlas Copco

Three years ago Atlas Copco launched the first of the new generation of solid body breakers based on a new manufacturing method and new body design, and last year it sold more than 10,000 small breakers in the 50 to 550kg class. Atlas Copco SB breakers are used for road work, trenching, general demolition, plus primary and secondary rock breaking, and the company is now launching the mid-range model, the SB 302, for excavators of up to 9tonnes.
March 7, 2012 Read time: 2 mins
Atlas Copco's new SB 302 breaker for excavators of up to 9tonnes
Three years ago 161 Atlas Copco launched the first of the new generation of solid body breakers based on a new manufacturing method and new body design, and last year it sold more than 10,000 small breakers in the 50 to 550kg class.

Atlas Copco SB breakers are used for road work, trenching, general demolition, plus primary and secondary rock breaking, and the company is now launching the mid-range model, the SB 302, for excavators of up to 9tonnes.

Thord Wikström, product line manager, says: "One of the most important features in the new design of our 300kg breaker is the floating bushing which makes service and maintenance really easy. The new SB 302 brings many advantages to the operator such as higher impact rate thanks to its higher efficiency. Compared with previous models, the new body design generates lower vibrations and less noise to meet the high expectations of our customers.

"A solid body breaker is machined from a single block of metal. This method provides a number of benefits, such as no side or head bolts and a unique resistance to bending forces and operator abuse. Another advantage is fewer parts and less maintenance." The slim design of the SB 302 makes positioning easy, and its compact dimensions also facilitate working in confined applications such as indoor demolition work, along house walls and in narrow trenching, says Atlas Copco.

Conny Sjöbäck, technical development manager, concludes: "We are proud to launch the sixth model in the new solid body range which represents an advancement in our state-of-the-art technology. By further developing the solid body concept, we have created the SB 302 to help boost the productivity of our customers."

For more information on companies in this article

Related Content

  • Strabag on the edge with a Dynapac DF145CS paver from Atlas Copco
    June 10, 2015
    When asphalting the inside of the newly raised edge of a water dam, Austrian road construction company Strabag faced a challenge. The paver had to be operated at an angle of between 34-41 degrees with material fed into the hopper from a ledge just 2.8m wide on the edge of the dam. The Waldeck 2 kidney-shaped hydroelectric station is located on a mountaintop about 500m above sea level on Lake Eder in central Germany. The dam, owned by global energy group E.ON, has a perimeter of about 3km. An important pa
  • New crushing and screening developments abounded at Hillhead
    October 3, 2014
    A wide array of crushing, screening and materials handling technologies have been introduced in recent months - Mike Woof writes The manufacturers of crushing and screening products have been developing an array of new systems to optimise production. The recent Hillhead show in the UK was the launch point for a number of these new products, although firms from all over the world have also been developing new designs. Productivity and wear life are two performance factors seeing major benefits from innovatio
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • App upgrades and power choices
    December 10, 2024
    New power options and app options are available for the crushing and screening segment