Skip to main content

Major earthmoving equipment order for key highway

An order for six MT31 ADTs forms part of a new fleet of Doosan machines delivered to Hydrobudowa, a Polish contractor specialising in complex civil engineering, infrastructure and construction projects. The deal also comprises four Doosan excavators, two DX300LC models and two DX340LC units, all of which have been supplied by dealer, Grausch i Grausch maszyny Budowlane. Five of the new Doosan ADTs are currently working on the construction of the Bojanowo - Rawicz section of the new highspeed S5 Expresswa
February 24, 2012 Read time: 2 mins
An order for six MT31 ADTs forms part of a new fleet of 695 Doosan machines delivered to 3206 Hydrobudowa, a Polish contractor specialising in complex civil engineering, infrastructure and construction projects.

The deal also comprises four Doosan excavators, two DX300LC models and two DX340LC units, all of which have been supplied by dealer, Grausch i Grausch maszyny Budowlane. Five of the new Doosan ADTs are currently working on the construction of the Bojanowo - Rawicz section of the new highspeed S5 Expressway, whilst the sixth machine is working on the construction of a new sports facility in Torun.

The trucks are being used to transport loose materials from storage areas to the construction sites and the Doosan DX300LC and DX340LC excavators are carrying out loading work. Bridge and piling works are already underway as are the works for the frame culverts and the utilities, with the reconstruction of telecommunications, sewage and water mains lines already started.

Access routes to the main structures have also been completed.

A consortium comprising BPG and Hydrobudowa Polska has also won contracts for the construction of motorways and high-speed roads, a €918.4 million investment that will boost connectivity and road safety in Poland. At present large-scale construction work is underway on the A4 highway (the Tarnów-Rzeszów section from the Krzyz to Debica Pustynia Interchange), the A1 Torun-Stryków highway, (Czerniewice-Brzezie and Brzezie-Kowal sections), the high-speed S5 Expressway (Poznan-Wroclaw and Kaczkowo- Korzensko sections), and the Bojanowa and Rawicza ring road, using the Doosan ADTs and DX300LC and DX340LC excavators.

For more information on companies in this article

Related Content

  • Doosan new high performing crawler excavators on show
    February 6, 2015
    A number of Doosan’s wide range of new Stage IV/Tier 4 Final crawler excavators are new from the firm.
  • Doosan new high performing crawler excavators on show
    January 6, 2017
    A number of Doosan’s wide range of new Stage IV/Tier 4 Final crawler excavators are new from the firm.
  • Poland is planning a series of highway projects
    March 15, 2013
    Poland’s Ministry of Transport plans to invest heavily in road projects from 2014-2020. The Polish road authority, GDDKiA, will invest €16.91 billion in new roads. A key project will be for the section of the Berlin-Lisbon A2 highway that runs through Poland. This will run through Zakret near Warsaw and connect to the Minsk Mazowiecki ring road and is expected to cost close to €1.7 billion. Meanwhile the A1 highway linking Pyrzowice and Tuszyn will cost in excess of €1.8 billion. GDDKiA is also planning to
  • Boosting output at a Czech quarry
    March 24, 2021
    The addition of a Doosan DX300LC-5 excavator to an existing quarry operation has helped boost production by 20-30%. The new machine is now working at the Mítov quarry in the Czech Republic.