Skip to main content

Major earthmoving equipment order for key highway

An order for six MT31 ADTs forms part of a new fleet of Doosan machines delivered to Hydrobudowa, a Polish contractor specialising in complex civil engineering, infrastructure and construction projects. The deal also comprises four Doosan excavators, two DX300LC models and two DX340LC units, all of which have been supplied by dealer, Grausch i Grausch maszyny Budowlane. Five of the new Doosan ADTs are currently working on the construction of the Bojanowo - Rawicz section of the new highspeed S5 Expresswa
February 24, 2012 Read time: 2 mins
An order for six MT31 ADTs forms part of a new fleet of 695 Doosan machines delivered to 3206 Hydrobudowa, a Polish contractor specialising in complex civil engineering, infrastructure and construction projects.

The deal also comprises four Doosan excavators, two DX300LC models and two DX340LC units, all of which have been supplied by dealer, Grausch i Grausch maszyny Budowlane. Five of the new Doosan ADTs are currently working on the construction of the Bojanowo - Rawicz section of the new highspeed S5 Expressway, whilst the sixth machine is working on the construction of a new sports facility in Torun.

The trucks are being used to transport loose materials from storage areas to the construction sites and the Doosan DX300LC and DX340LC excavators are carrying out loading work. Bridge and piling works are already underway as are the works for the frame culverts and the utilities, with the reconstruction of telecommunications, sewage and water mains lines already started.

Access routes to the main structures have also been completed.

A consortium comprising BPG and Hydrobudowa Polska has also won contracts for the construction of motorways and high-speed roads, a €918.4 million investment that will boost connectivity and road safety in Poland. At present large-scale construction work is underway on the A4 highway (the Tarnów-Rzeszów section from the Krzyz to Debica Pustynia Interchange), the A1 Torun-Stryków highway, (Czerniewice-Brzezie and Brzezie-Kowal sections), the high-speed S5 Expressway (Poznan-Wroclaw and Kaczkowo- Korzensko sections), and the Bojanowa and Rawicza ring road, using the Doosan ADTs and DX300LC and DX340LC excavators.

For more information on companies in this article

Related Content

  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Doosan machines for B2 highway project in Germany
    January 30, 2014
    Thannhauser + Ulbricht Straßen- und Tiefbau of Fremdingen in Southern Germany, is currently upgrading the country's B 2 federal highway near the town of Roth and employing four new Doosan DA30 articulated dump trucks (ADTs) and a new Doosan DX490LC-3 crawler excavator for the earthmoving work. The machines belong to the rental fleet of Rühle Maschinenpark, based in Untermünkheim-Haagen, South West Germany. The B 2 is one of Germany's oldest highways and runs the entire length of the country for a distance
  • Advanced earthmovers now available
    May 10, 2018
    The excavator and wheeled loader segments represent massive sales volumes for manufacturers, so new model development is prioritised - Mike Woof writes. The crawler excavator segment accounts for a substantial portion of total sales of construction machines. With this in mind, it is no surprise that this is a market segment for which manufacturers prioritise a significant proportion of their research and development budgets. Wheeled loaders, while not selling in quite such large numbers as crawler excava
  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,