Skip to main content

Long-life pumping

A Tsurumi pump is still providing good service after 22 years in the fleet of Dutch rental firm Verno, which focusese on the construction market. The LB250 submersible model, for which production stopped over a decade ago, is thought to be the longest-serving Tsurumi pump in Europe. However, Verno, says that the unit's long service record is a product of its versatility, robust design and build quality
February 7, 2012 Read time: 1 min
Rugged and durable, a Tsurumi pump is still working well after 22 years hard use
A 2357 Tsurumi Pump is still providing good service after 22 years in the fleet of Dutch rental firm Verno, which focusese on the construction market. The LB250 submersible model, for which production stopped over a decade ago, is thought to be the longest-serving Tsurumi pump in Europe. However, Verno, says that the unit's long service record is a product of its versatility, robust design and build quality.

Pumping equipment is used in a wide array of construction applications, above and below ground, and usually it will only last ten years, so the fact that the Tsurumi LB250 belonging to Verno been in use for so long and has never needed a major repair is of note.

Since joining the company's fleet in 1988, the LB250 has been used in an array of projects in the Netherlands

For more information on companies in this article

Related Content

  • Aggregates advantages with new equipment
    November 4, 2019
    New equipment being introduced for the crushing and screening sector offers benefits for aggregate production – Mike Woof writes
  • Using technology so assess road surface quality
    April 4, 2014
    Advances in survey technology and the evolving face of road procurement are driving demand for highway condition data. Mark Thomas, infrastructure services manager at Fugro Aperio writes how surveys of new roads can improve long-term quality While a growing suite of non-intrusive testing, measurement and survey technologies are widely used to target highway repairs and to determine asset management strategies, the use of these powerful tools remains patchy in the early stages of the infrastructure life cycl
  • A new runway surface for a major airport in Indonesia
    August 12, 2020
    Major rebuilding work has been carried out at Minangkabau International Airport (PDG), while the New Yogyakarta International Airport (NYIA) has been built in Indonesia.
  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.