Skip to main content

Loaders assist with clearing China road blockage

Earthmoving machines from XCMG have played an important role in helping clear a road blockage in China A road in China’s Gansu Province became blocked following a period of heavy rain. A landslide on a grass slope at a tunnel portal on National Highway 212 recently caused major traffic delays in the area. The task of clearing up the landslide was made more difficult still by around 500m3 of stone close to the tunnel portal also being moved by the landslide. Another route in the area that carries tourist
October 25, 2016 Read time: 2 mins
XCMG has supplied wheeled loaders such as this unit to clear a landslip from a tunnel portal
Earthmoving machines from 2490 XCMG have played an important role in helping clear a road blockage in China

A road in China’s Gansu Province became blocked following a period of heavy rain. A landslide on a grass slope at a tunnel portal on National Highway 212 recently caused major traffic delays in the area. The task of clearing up the landslide was made more difficult still by around 500m3 of stone close to the tunnel portal also being moved by the landslide. Another route in the area that carries tourist traffic was also affected by landslides, a major road in Longnanwen County.

A request for emergency assistance was sent out from the management departments of the two road sections. The Longnanwen county highway management department initiated its emergency rescue plan, quickly mobilising large items of construction equipment and personnel to move to the scene of the blockages. Construction machines from XCMG were brought to the area and began moving away the material causing the blockages at two key points.

The use of the XCMG wheeled loaders ensured that the two busy routes could be reopened to traffic in a short space of time. Just two hours were required to reopen the blockage at the tunnel portal on National Highway 212. The landslide on the Longnanwen County road was cleared even more quickly, taking just one hour once the equipment had started work onsite. The damage to the slopes caused by the landslide was also repaired and these routes are now far less likely to suffer blockages in the future at these specific points.

For more information on companies in this article

Related Content

  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Roo'd Awakening and BMW Drivers
    June 29, 2018
    A rider amongst a group of cyclists on a training run in Australia had a rather unpleasant experience. The man was cycling along a road with his team mates when a young kangaroo jumped out from the road side and collided with him, knocking him from his bicycle. Although he was riding at speed at the time, he was not seriously hurt and as one of his team mates filmed the incident, will have video footage to better remember the incident by. The feelings of the kangaroo over the incident were not recorded.
  • Joy riding
    August 15, 2019
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected] JOY RIDING A couple in the US recently took advantage of the self-driving features of a Tesla car for reasons other than transportation. They ignored the suggestions from Tesla to remain alert even when the vehicle was using its self-drive mode and instead engaged in sexual acts, which they recorded on vid
  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports