Skip to main content

Kramer rebrands and updates 5 Series and premium 8 Series loaders

German loader manufacturer Kramer-Werke has revised its products as part of a rebrand programme. The Kramer brand now stands alone, without the addition of allwheel. As part of the rebrand, Kramer has adapted machine names to indicate size classes for its economy 5 Series and premium 8 Series products. For example, 8095T stands for a Series 8 product with a bucket capacity of 0.95m3 and the T stands for tele wheel loader. The new wheeled loader models of the 5 Series, 5075, 5085, 5085T and 5095 with
January 12, 2015 Read time: 2 mins
The compact Kramer wheeled loaders now feature new power plants
German loader manufacturer 4849 Kramer Allrad has revised its products as part of a rebrand programme. The Kramer brand now stands alone, without the addition of allwheel.

As part of the rebrand, Kramer has adapted machine names to indicate size classes for its economy 5 Series and premium 8 Series products. For example, 8095T stands for a Series 8 product with a bucket capacity of 0.95m3 and the T stands for tele wheel loader.

The new wheeled loader models of the 5 Series, 5075, 5085, 5085T and 5095 with bucket sizes from 0.75-0.95m3 have been completely revised, including the cab, engine and powertrain.

The central component of the larger models 5085T and 5095 is a charge air-cooled 4-cylinder turbo engine with 55kW. Torque has been increased by up to 17%. Kramer said thanks to the maintenance-free diesel oxidation catalyst (DOC) there is no downtime. Compared to technology with diesel particulate filters (DPF), DOC needs no active open burning. DOC also reduces fuel consumption.

The cabins have a multi-function joystick, hand throttle, low-speed control and load stabiliser. The larger wheeled loaders from the 5075 model upwards also have three steering options: all-wheel, front-wheel and crab steering.

The Premium 8 Series - formerly the 80 series - features the seven wheeled loader models from 8075 to 8115. Wheeled loader 8075 has a 35kW 7139 Yanmar engine that meets emission Stage 3A standard.

The other six wheeled loader and tele wheel loader models 8085, 8085T, 8095, 8095T, 8105 and 8115 are equipped as standard with the 55kW 201 Deutz engine TCD 2.9. The exhaust aftertreatment takes place via the DOC technique. Larger models in the series, such as the wheeled- and tele-wheel loaders 8105, 8115 and 8095T, have the option of a 75kW engine.

Also optional for all of the 8-series models is the Powerflow high-performance hydraulic system. This allows operation of powerful hydraulic attachments such as asphalt mills or rotary snow ploughs.

For more information on companies in this article

Related Content

  • Kato Imer announces Italian production of Kato V4 mini-excavators
    April 23, 2018
    Kato Imer has announced the production of two Kato V4 series mini-excavators – the 30V4 and 35V4 with operating weights of 3 tonnes and 3.5 tonnes respectively – at the Imer Group facility in San Gimignano. This brings to seven the number of models now produced at the facility, making it of strategic importance to Kato and accounting for 80% of Kato Imer revenue. The V4 series has three hydraulic pumps in place of load sensing, increasing speed of movement without losing controllability, claims the
  • Kubota moves up the power band with V5009
    April 25, 2018
    Kubota has launched its 09-series large displacement engine to a European audience. Badged the V5009, the four-cylinder 5 litre diesel engine boasts a peak output of 157.3kW from its compact dimensions, and is part of an engine strategy that will see the Japanese maker provide customer solutions in the 150kW category. Kubota’s V5009 engine is expected to meet forthcoming EU Stage V emissions from its adoption of DOC, DPF and SCR processes within its exhaust after-treatment package. The V5009 engine is
  • Kramer goes all electric for its new wheel loader 5055e
    April 13, 2016
    Kramer, part of the Wacker Neuson Group, will start deliveries of its fully electric wheel loader 5055e starting this summer. Charge time for the 1.2tonne lead-acid battery system is between three and six hours, depending on the work at hand. Its small size - 0.55m³ bucket capacity – and zero emission performance makes it suitable for close-quarters work, including road tunnel applications.
  • Advances in milling
    July 23, 2024
    Some major machine manufacturers have introduced improved milling equipment to the market - Mike Woof reports