Skip to main content

Kobelco rolls out seven mini-excavators at INTERMAT 2015

Kobelco has unveiled seven new mini-excavators below 3tonnes at INTERMAT 2015 in Paris as a result of a major agreement with construction equipment manufacturer Yanmar. The deal increases the options for Kobelco customers and potential customers who work in extremely tight environments. “INTERMAT is our first announcement and roll out of these models,” said Sander Gesink, Kobelco’s brand marketing manager.
January 6, 2017 Read time: 2 mins
Kobelco Mini Excavators

2200 Kobelco has unveiled seven new mini-excavators below 3tonnes at INTERMAT 2015 in Paris as a result of a major agreement with construction equipment manufacturer Yanmar.

The deal increases the options for Kobelco customers and potential customers who work in extremely tight environments. “INTERMAT is our first announcement and roll out of these models,” said Sander Gesink, Kobelco’s brand marketing manager.

“For us the key is having additional traditional long-radius mini-excavators where the counterweight is to the rear of the machine, outside the track length,” he went on.

“Kobelco is well known for its short radius mini-excavators where the counterweight is totally within the length of the tracks and the cab rotates within the track length and width. Because of the zero tail swing on the SK10SR-3, SK17SR-5 and SK25SR-6, these machines are excellent for narrow environments.”

Meanwhile, the traditional, or conventional, machines - SK16, SK18, SK22 and SK26 - have a higher lifting capacity because of the longer distance between load and rear counterbalance which makes it more stable than small radius machines. You can operate heavier buckets and lift more soil.

But these conventional machines are equally at home on major sites where exceptional digging and lifting power is required, especially within the 1.7tonne and 2.7tonne classes.

Another feature is a retractable crawler system on the short range 10SR-3 and 17SR-5. This driver-cab operated system gives a larger foot-print for additional working stability on loose terrain. A fully opening engine bay door ensures ease of maintenance. Also, the new dozer blade design on the 10SR-3 and 7SR-5 features a cutting edge.

Availability of all seven models is expected by the third quarter of this year.

For more information on companies in this article

Related Content

  • Scenic location requires careful quarrying
    September 11, 2014
    The picturesque surroundings of the Carrière de Cusy quarry, situated in France’s Parc Naturel Régional du Massif des Bauges, make it evident why the company has a strong commitment to restoration.
  • JCB’s radical new wheeled excavator
    March 21, 2016
    The new JCB Hydradig compact wheeled excavator will “change the way the construction equipment industry operates in the 21st Century,” according to one senior company figure. Said to be the culmination of a three-year project born from customer demand, the new 10tonne model was unveiled this week to trade media at JCB’s World HQ in Rocester, county Staffordshire, UK.
  • Topcon machine control units take the heat off an Alaskan contractor
    December 4, 2015
    Juniper, spruce, cranberry, cottonwood and rose. Most people think of pine trees and berries amid beautiful country fields. But for one contractor based just below the Arctic Circle in the US state of Alaska, the names represent a successful job completed using machine control. Valley General Construction recently finished a US$350,000 contract for the upgrading of country roads in the local borough of Matanuska-Susitna. The colourful names belong to roads in a heavily wooded residential subdivision located
  • Bridge lift in Orlando for interstate rebuild
    July 4, 2019
    Measuring 33.8km long and costing US$2.3 billion, Orlando’s massive I-4 Ultimate is the largest infrastructure project in the Florida Department of Transportation’s history. Divided into four phases, the project requires major bridge work to improve traffic flow through Central Florida. In all, 13 existing structures are being widened, 53 new bridges added and 74 bridges replaced. Area 2, currently under construction, runs through Orlando from Highway 50 at the northern edge to the Highway 423/I-4 interc