Skip to main content

An IKEA trip for the UK’s NM Group - North Midland Construction

The UK’s NM Group - North Midland Construction - completed its first contract for iconic furniture retailer IKEA at the Swedish group’s flagship Sheffield store. The nearly-31,600m² store cost €68 million to build and created 480 jobs. The retailer’s most sustainable store to date, it incorporates photovoltaic panels and rainwater harvesting as well as linking to a district heating scheme.
April 17, 2018 Read time: 2 mins
The UK’s NM Group - North Midland Construction - completed its first contract for iconic furniture retailer IKEA at the Swedish group’s flagship Sheffield store. The nearly-31,600m² store cost €68 million to build and created 480 jobs. The retailer’s most sustainable store to date, it incorporates photovoltaic panels and rainwater harvesting as well as linking to a district heating scheme.


The site lies on the busy A6178 Sheffield Road near junction 34 of the M1 motorway, explained Geoff Poyzer, managing director of NM Group’s highways division. One of the main arterial routes into Sheffield and close to a major shopping centre, the project required extensive traffic management throughout construction. As the project ran in parallel with the construction of the new store, NM Group worked hand in hand with both 8100 Highways England and IKEA’s building contractors. NM’s remit was to widen roundabout approaches and construct more lanes to increase the road capacity at four junctions. NM also created a completely new service entrance for the 983-space car park.

For more information on companies in this article

Related Content

  • 19th century Newhall Road Bridge gets 21st century makeover
    April 10, 2018
    A Sheffield bridge with a history dating back to the 17th century has been strengthened, repaired and restored by Amey. Newhall Road bridge over the River Don is one of 240 road bridges and culverts in Sheffield to be given a new lease of life thanks to investment linked to Sheffield City’s €2.5 billion Streets Ahead highway maintenance contract.
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Turkish highways and bridge project financing secured
    June 7, 2018
    The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance
  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.