Skip to main content

An IKEA trip for the UK’s NM Group - North Midland Construction

The UK’s NM Group - North Midland Construction - completed its first contract for iconic furniture retailer IKEA at the Swedish group’s flagship Sheffield store. The nearly-31,600m² store cost €68 million to build and created 480 jobs. The retailer’s most sustainable store to date, it incorporates photovoltaic panels and rainwater harvesting as well as linking to a district heating scheme.
April 17, 2018 Read time: 2 mins
The UK’s NM Group - North Midland Construction - completed its first contract for iconic furniture retailer IKEA at the Swedish group’s flagship Sheffield store. The nearly-31,600m² store cost €68 million to build and created 480 jobs. The retailer’s most sustainable store to date, it incorporates photovoltaic panels and rainwater harvesting as well as linking to a district heating scheme.


The site lies on the busy A6178 Sheffield Road near junction 34 of the M1 motorway, explained Geoff Poyzer, managing director of NM Group’s highways division. One of the main arterial routes into Sheffield and close to a major shopping centre, the project required extensive traffic management throughout construction. As the project ran in parallel with the construction of the new store, NM Group worked hand in hand with both 8100 Highways England and IKEA’s building contractors. NM’s remit was to widen roundabout approaches and construct more lanes to increase the road capacity at four junctions. NM also created a completely new service entrance for the 983-space car park.

For more information on companies in this article

Related Content

  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • Highways England to upgrade Winchester M3 junction
    July 5, 2019
    Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester. Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout. The M3 is the main road between London and the Solent Ports or
  • North East UK’s A19 /A1058 Coast Road triple-deck junction opens
    April 5, 2019
    More than 80,000 drivers a day are now using the recently opened and - first ever - North Tyneside triple-deck highway junction in the northeast. England’s A19 /A1058 Coast Road junction improvement scheme, being done for the client Highways England, was opened on time. However, there will be some overnight closures in the next several weeks to complete the landscaping, traffic light and footpath work. A time capsule has been buried on site and is due to be opened in 2118. Work started in June 2016 on