Skip to main content

Hydraulic hammer proves its worth

Indeco's innovative HP18000 hydraulic hammer is now being proven in a tough demolition application in the US. The Italian company hopes to sell more of its innovative HP18000 models now that its class-leading hydraulic system is proving its worth in the field. Tipping the scales at an impressive 11tonnes, the HP18000 is now the biggest breaker available on the market anywhere and is designed for use on carriers that weigh up to 140tonnes. Some 4.6m long and with a 250mm diameter tool, the HP18000 can delive
April 10, 2012 Read time: 2 mins
Indeco's innovative The HP18000 hydraulic hammer from Indeco is being proven in a tough demolition application
237 Indeco's innovative HP18000 hydraulic hammer is now being proven in a tough demolition application in the US.

The Italian company hopes to sell more of its innovative HP18000 models now that its class-leading hydraulic system is proving its worth in the field.

Tipping the scales at an impressive 11tonnes, the HP18000 is now the biggest breaker available on the market anywhere and is designed for use on carriers that weigh up to 140tonnes. Some 4.6m long and with a 250mm diameter tool, the HP18000 can deliver 460blows/minute and is said to offer a significantly greater breaking performance than existing units in the 7tonne hammer class. This breaker suits duties in the largest demolition projects, as well as in primary winning in quarrying or mining applications.

To introduce the HP18000, Indeco had to develop a new hydraulic system able to cope with the huge forces its hammer mechanism generates. The central feature of this is an automatic system that governs operating speed and power variation within the hydraulic circuit. Called the collateral damage prevention system, this can warn the operator of any impending technical problems and prevent costly damage before it occurs. As a result, downtime due to maintenance is reduced and uptime increased, boosting overall performance.

Indeco says that the HP18000 has been designed to offer a long working life and high reliability and features an external regulation system mounted on the casing. Although the breaker represents a significant increase in scale over the firm's existing 7.8tonne HP12000 model, this larger unit shares similar design features such as the proven central greasing system as this helps reduce wear and extend operating life.

The rugged and durable case design for the HP18000 and its mounting system are also similar to that of the HP12000, although increased in scale.

For more information on companies in this article

Related Content

  • Atlas Copco introduces three powerful hydraulic breakers
    April 10, 2015
    Atlas Copco has boosted its breaker range with the addition of three new models. These breakers form part of the essential case-mounted (EC) range and are designed to fit 22- 49tonne carriers. The heavy range breakers are the EC 140 T, EC 150 T and EC 155 T. As with other models in this range, the new units are said to offer fast return on investment due to factors such as simplifed maintenance and operation. The firm claims that these EC breakers generate powerful forces inside a compact body while bein
  • Rammer’s tough breakers for tunnelling
    March 31, 2016
    Based on customer demand for new, extreme duty hydraulic breakers, Rammer is launching two new PRO hammers. The Rammer 2577 PRO and Rammer 5011 PRO are said to be innovative and tough.
  • Powerful hydraulic hammers from Cat
    May 27, 2022
    Caterpillar has launched the new H190 S and H215 S performance series hammers, designed for use on large excavators.
  • Rammer hammer helps break up rock in Malaysia
    January 19, 2016
    A Rammer 5011 rock breaker has been successfully used to break extremely hard granite on a Kuala Lumpur development. The excavation and site preparation for a development project in Taman Connaught, Cheras, in Kaula Lumpur’s south-eastern suburbs was recently undertaken by local civil engineering contractor, Crescendo Infra Sdn Bhd on behalf of a local developer. In order to deal with the extremely hard granite that was found in the locale, it was initially planned to bring in a blasting contractor to help