Hitachi launches the first Zaxis-6 excavator in Europe

Hitachi Construction Machinery (Europe) has presented the first model of its Zaxis-6 medium excavator range, the X300LC-6, which is said to benefit from several enhancements made to the Zaxis-5 range. Hitachi design engineers have incorporated new TRIAS II technology into the Zaxis-6 range of excavators to meet EU Stage IV emission regulations. Hydraulic loss is decreased by reducing the amount of hydraulic oil returned to the tank due to cooperative control of the pump and valve.
April 23, 2015 Read time: 2 mins

233 Hitachi Construction Machinery (Europe) has presented the first model of its Zaxis-6 medium excavator range, the X300LC-6, which is said to benefit from several enhancements made to the Zaxis-5 range.

Hitachi design engineers have incorporated new TRIAS II technology into the Zaxis-6 range of excavators to meet EU Stage IV emission regulations. Hydraulic loss is decreased by reducing the amount of hydraulic oil returned to the tank due to cooperative control of the pump and valve. Two solenoid valves have been added to control the pump flow effectively, lowering fuel consumption. An auto shutdown feature also prevents fuel wastage, as well as reducing noise levels, exhaust emissions and CO2.

Inside the cab, the technology within the multi-function LCD monitor enables operators to check the machine’s status and settings at a glance, and the new machine also has Hitachi’s remote monitoring Global e-Service.

Another significant change to the Zaxis-6 range is the implementation of a selective catalytic reduction (SCR) system. A urea solution is injected into the exhaust gas of the excavators to reduce nitrous oxide from the emissions. An after-treatment device, integrated with diesel oxidation catalyst, urea water mixing pipe, SCR catalyst and silencer, has also been incorporated.
The engine output of the 30tonne class ZX300LC-6 has been increased to 186kW, compared to 140kW for the ZX290LC-5.

Hiroyuki Kamata, HCME general manager of engineering, was involved in the design and testing of the new Hitachi Zaxis-6 excavators.

“Our first priority was to ensure that the machine worked properly, and the next priorities were the controllability and operating experience,” he says. “Overall the results were positive in terms of performance. We are confident that Hitachi customers will be happy operating the new Zaxis-6 models.”

For more information on companies in this article

Related Content

  • Big excavators go ‘e’
    September 28, 2023
    These days, even those beasts of the construction site – excavators – have a date with sustainability, despite the huge amount of electric power needed to operate a machine that pushes about high loads of dirt.
  • New asphalt paving developments are coming to market
    January 7, 2015
    Atlas Copco introduces new low emission diesels in its latest large paver models - Mike Woof writes The large pavers from Atlas Copco’s Dynapac range are now compliant with the Tier 4 Final/Stage IV emissions regulations due to the installation of new engines. Running costs are also said to have been reduced due to lower fuel consumption and the firm claims each of the latest models can offer a fuel saving of 4200 litres/year, as well as a reduction in CO2 emissions of 11tonnes/year.
  • Loading and hauling machine improvements will boost quarry production
    July 4, 2014
    Major advances are being seen in the market for loading and hauling machines, with manufacturers developing new solutions for the quarry segment in particular- Mike Woof writes Wheeled loaders and rigid chassis dump trucks are key movers in many quarry operations. New develop-ments have seen the introduction of several new models from key players.
  • Hitachi ZX135US-5 and ZX210LC-5 excavators work in Sjodalen valley
    July 7, 2016
    Norwegian contractor Skogen has started building a service road for a log-cabin development in Norway’s Sjodalen valley. More than 90 of the 120m2 cabins are being constructed to order and the project is scheduled to be completed within the next 12 months. The Vågå-based company was set up in 1982 by owner Ola Skogen and is firmly focused on general construction activities including groundworks and roads, as well as foundations, drainage and utilities for log cabins. The contractor’s medium excavat