Skip to main content

High production wheeled loader

Volvo’s new L250G wheel loader is being tested for the first time by a German family-run quarrying, logistics and concrete plant company with growing customer demands. Löderburger Baustoff + Transport (LBT), part of the larger Ferdinand Wesling Group, is using the machine at its two million tonnes a year yield limestone quarry in Stassfurt.
March 15, 2012 Read time: 2 mins
High production loading is being achieved with the new Volvo L250 wheeled loader in Germany
Volvo’s new L250G wheel loader is being tested for the first time by a German family-run quarrying, logistics and concrete plant company with growing customer demands.

Löderburger Baustoff + Transport (LBT), part of the larger 3903 Ferdinand Wesling Group, is using the machine at its two million tonnes a year yield limestone quarry in Stassfurt. The limestone is used for shaft furnace bricks for a local sodium carbonate producer, as well as chippings for concrete and asphalt mixes for road construction, building blocks and other road construction materials.

The 50-hectare Stassfurt quarry, now 55 meters deep, is so busy feeding the sodium carbonate factory that LBT employees work seven days a week, 365 days a year, with Volvo loaders putting in ten to 16-hour days.

The Wesling Group is a major Volvo Construction Equipment (359 Volvo CE) customer, running a fleet of 35 wheel loaders across Germany – 10 of which are at work in the Stassfurt quarry.

LBT says the L250G has revolutionised efficiency for the company, effortlessly tackling a variety of tasks. Rather than making four cycle loads, LBT claims the L250G can finish the job in only three - saving time, money and fuel.

For more information on companies in this article

Related Content

  • Higher productivity, lower cost asphalt plants
    February 14, 2012
    Manufacturers are producing innovative asphalt equipment, and operators are benefiting from this as Patrick Smithreports. Asphalt plant manufacturers and operators are understandably placing great emphasis on higher productivity but with lower costs. At the same time they are aware of environmental issues and the ever-increasing use of recycled material in mixes.
  • Volvo CE’s electric quarry operation commences trials
    August 29, 2018
    Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site
  • Quarry operators improve on productivity
    February 13, 2012
    With capital expenditure plans being reduced, many quarry operators are using the funds available to improve on productivity with their existing equipment fleets. Claire Symes reports. The economic downturn has had a big impact on the aggregates production sector with many quarry operators looking to reduce costs and rationalise operations. The impact of this can be seen in the reduction of capital expenditure plans but the investments that are being made are focused on efficiency.
  • Qatar quarry boosts output with SDLG wheeled loaders
    February 8, 2018
    A fleet of SDLG wheeled loaders is helping to optimise production at a quarry in Qatar. The three SDLG wheeled loaders are operating long hours and are being used to feed crushing and screening equipment at the site in Qatar. The three SDLG LG958L wheeled loaders have managed to clock 2,000 operating hours in four months at the quarry. The site is owned by Doha-based contracting company Al Maram International, which uses crushing and screening equipment to reduce and sort limestone, primarily for asphalt