Skip to main content

Heavy work for Cat 730C Ejector Truck on English bypass

When Flannery Plant Hire was awarded work on the Norwich bypass project, they purchased a wide range of new Caterpillar machines. Caterpillar dealer Finning UK & Ireland supports construction of the Norwich Bypass, one of the UK’s largest road infrastructure projects, with a vast range of Caterpillar machines and advanced Caterpillar Production Management - CPM. Known as the Northern Distributor Road, the project is managed by primary contractor Balfour Beatty, with P. Flannery Plant Hire as main earthwork
December 18, 2017 Read time: 2 mins

When Flannery Plant Hire was awarded work on the Norwich bypass project, they purchased a wide range of new 178 Caterpillar machines.

Caterpillar dealer 1413 Finning UK & Ireland supports construction of the Norwich Bypass, one of the UK’s largest road infrastructure projects, with a vast range of Caterpillar machines and advanced Caterpillar Production Management - CPM.  Known as the Northern Distributor Road, the project is managed by primary contractor Balfour Beatty, with P. Flannery Plant Hire as main earthworks contractor. Flannery’s new Caterpillar machines range from 5-50tonne excavators and the latest ADT’s, including the Cat 730C ejector truck which is fitted with CPM. The purchase of the ejector with CPM was firstly all about productivity and safety, as ejector trucks need not stop to lift the skip to tip material.

The Cat 730C ejector unit creates a safer working environment by displaying payload weight and status including external lights which automatically signal when target payload has been achieved.

The payload on the machine is shown on the in-cab monitor which enables operators to ensure the truck is not under or overloaded, which in turn optimises fuel burn per tonne on each cycle meaning the productivity of the machines are more efficient.

This information can be used by Balfour Beatty to provide the best possible carbon footprint on site as well as being able to see the impact of the fleet.

CPM tracks and measures data such as tonnes per load, tonnes per cycle and distance travelled per day. It also measures litres of fuel a machine burns per hour which gives the project a daily overview of progression.

No matter where the units are working on the new 20km dual carriageway, data can be sent and received in real time. For the team on site, this data is sent via VisionLink into the online portal where management and the Balfour Beatty team access it from any connected location. By combining CPM with additional data relating to the health of machines through VisionLink, potential issues with machines are more visible which results in a significant reduction in downtime.

For more information on companies in this article

Related Content

  • Caterpillar develops advances telematics technology to track machine performance
    February 24, 2017
    Caterpillar is launching new Cat Connect hardware and software to enable equipment managers to connect all of their assets—from the largest earthmover to the smallest generator, and including both light and heavy-duty trucks and utility vehicles. New Cat Product Link technologies connect any brand and type of equipment, powered or non-powered, and all report through a single system, VisionLink. The new technologies are said to offer multiple communications channels—cellular, satellite and Bluetooth—to b
  • Intelligence built in to Dynapac machines
    January 16, 2017
    The highly sophisticated Fleetlink telematics system developed is now being offered across the road machine range. The system allows users to optimise fleet usage and reduce maintenance costs, boosting overall efficiency and fleet management and increasing uptime and productivity.
  • Asphalt road construction solutions demonstrated
    February 28, 2012
    Road machinery specialist BOMAG has carried out a two day demonstration event at its headquarters in Boppard, Germany.
  • Cultivate better on-site safety awareness by leveraging technology with Leica Geosystems
    August 10, 2023
    When a vital fiber-optic cable was cut during construction work in Germany, the impact was huge. There were telecom disruptions affecting the greater Frankfurt area, all departures and landings at Frankfurt Airport were suspended, and Lufthansa’s global IT system crashed. Leica Geosystems says it is vital to put in place “strategies to protect people, equipment, and assets… and to emphasise the crucial role digital solutions play in ensuring safety.”