Skip to main content

Great work at Great Tew for a great Doosan DL580-5

Great Tew Ironstone Quarry in North Oxfordshire in the UK has purchased a new top-of-the-range Doosan DL580-5 wheeled loader to increase production. The DL580-5 carries huge 14-16tonne blocks of Ironstone from the quarry face to a new €1.2 million stone processing plant that recently began production at the top of the quarry. Great Tew Ironstone has a striking brown and blue vein and is only available from this Oxfordshire quarry. A quarried block is often up to 30tonnes. “The new DL580-5 helps
July 5, 2019 Read time: 2 mins
A Doosan DL580-5 does some heavy lifting in England
Great Tew Ironstone Quarry in North Oxfordshire in the UK has purchased a new top-of-the-range 695 Doosan DL580-5 wheeled loader to increase production.


The DL580-5 carries huge 14-16tonne blocks of Ironstone from the quarry face to a new €1.2 million stone processing plant that recently began production at the top of the quarry.   

Great Tew Ironstone has a striking brown and blue vein and is only available from this Oxfordshire quarry. A quarried block is often up to 30tonnes.

“The new DL580-5 helps to process up to 100tonnes of stone a day at the new quarry plant,” said Paul Keyte, operations director at Johnston Quarry Group which owns the quarry.

Equipped with specially matched pallet tines, the DL580-5 brings the large blocks from the base of the quarry to the top and along a short road, at the end of which it loads them on to the sawing machines in the processing plant. Previously, the quarry was only able to move blocks weighing up to a maximum of 10tonnes, so the arrival of the DL580-5 has made this a much more efficient process, explained Keyte.

The DL580-5 features an advanced double circuit axle cooling system to provide an ideal solution for heavier work. This ensures the DL580-5 is ideal not only for block lifting in quarries and mines, but also heavy-duty applications in industrial, construction and recycling operations.

The overall size of the DL580-5 is almost the same as the DL550-5, the next model down in the Doosan range, but it has an operating weight of 36,030kg and higher static tipping loads (straight/full turn 40°) of 29,700 and 26,200kg, respectively.

The new model is equipped with a series of features that make the machine extremely reliable and durable. The front structure is more rugged, with greater rigidity and strength. The DL580-5 has reinforced Z-bar kinematics for heavier lifting with few moving parts. This design also helps stabilise the loader, enables rapid bucket movements and keeps the bucket at the right angle position at all times, according to Doosan.

For more information on companies in this article

Related Content

  • Get ready for winter road maintenance
    October 3, 2016
    The winter maintenance market heats up this summer. Bobcat has expanded its winter range of loaders with the addition of the S450 skid-steer and T450 compact tracked machines.
  • Bobcat unveils T40180 telehandler
    April 2, 2014
    Bobcat’s new T40180 18m telehandler is the Doosan brand’s largest rigid frame telescopic handler, and, like Bobcat’s T40140 14m model, has increased maximum lifting height based on a new easy-to-use design said to provide class-leading efficiency and productivity backed by state-of-the-art safety systems. The T40180 has a 4tonne maximum lift capacity and a maximum lift height of 17.52m. The lift capacity at top lift height is 2.5tonnes, while at maximum reach of 13.7m, lift capacity is 560kg. Unloaded
  • It’s Miller time for Doosan excavators and loaders in Scotland
    April 17, 2018
    Scottish Doosan dealer Balgownie has supplied new Doosan DX225LC-5 22tonne and DX255LC-5 25tonne excavators and a new DL420-5 wheeled loader to Miller Plant. Miller Plant offers services from bulk earthworks and contract crushing and screening to plant hire, site clearance, demolition, aggregate supply and heavy haulage and tipper hire. As the machines will do more than 60 hours a week each, they come with a peace-of-mind five-year warranty and Balgownie’s fast response to requests and service support.
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012