Skip to main content

Grading in tough conditions

Volvo graders have made an important contribution on upgrades to a 150km stretch of the NH7 highway, one of India's most important road links. The NH7 highway is an impressive 2,369km in length, linking the town of Kanyakumari, perched on the southern-most point of the Indian mainland where the Arabian Sea, Bay of Bengal and Indian Ocean meet, with the north-eastern holy city of Varanasi on the banks of the river Ganges.
July 6, 2012 Read time: 2 mins
Despite high temperatures and humidity, JMC's Volvo graders performed reliably on a project to upgrade part of India's important NH7 highway
2394 Volvo graders have made an important contribution on upgrades to a 150km stretch of the NH7 highway, one of India's most important road links. The NH7 highway is an impressive 2,369km in length, linking the town of Kanyakumari, perched on the southern-most point of the Indian mainland where the Arabian Sea, Bay of Bengal and Indian Ocean meet, with the north-eastern holy city of Varanasi on the banks of the river Ganges.

India's national highways make up just 2% of India's massive 3,300,000km road network but carry 40% of all traffic. Most boast two lanes in each direction, rising to four lanes around major cities. As India's economy has boomed, so has vehicle ownership and so has road building. The need to upgrade the NH7 for a 150km section between Madurai and Trichi in the southern state of Tamil Nadu had become pressing.

JMC Projects used two Volvo G720A motor graders on the job, each operating for 12 hours a day. The graders performed well on the three year project, which was completed recently and JMC says that it will buy more Volvo machines in the future as the units proved their ability to cope with India's tough climate, with temperatures as high as 40°C as well as high humidity and monsoon rains.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2