Skip to main content

Grading in tough conditions

Volvo graders have made an important contribution on upgrades to a 150km stretch of the NH7 highway, one of India's most important road links. The NH7 highway is an impressive 2,369km in length, linking the town of Kanyakumari, perched on the southern-most point of the Indian mainland where the Arabian Sea, Bay of Bengal and Indian Ocean meet, with the north-eastern holy city of Varanasi on the banks of the river Ganges.
July 6, 2012 Read time: 2 mins
Despite high temperatures and humidity, JMC's Volvo graders performed reliably on a project to upgrade part of India's important NH7 highway
2394 Volvo graders have made an important contribution on upgrades to a 150km stretch of the NH7 highway, one of India's most important road links. The NH7 highway is an impressive 2,369km in length, linking the town of Kanyakumari, perched on the southern-most point of the Indian mainland where the Arabian Sea, Bay of Bengal and Indian Ocean meet, with the north-eastern holy city of Varanasi on the banks of the river Ganges.

India's national highways make up just 2% of India's massive 3,300,000km road network but carry 40% of all traffic. Most boast two lanes in each direction, rising to four lanes around major cities. As India's economy has boomed, so has vehicle ownership and so has road building. The need to upgrade the NH7 for a 150km section between Madurai and Trichi in the southern state of Tamil Nadu had become pressing.

JMC Projects used two Volvo G720A motor graders on the job, each operating for 12 hours a day. The graders performed well on the three year project, which was completed recently and JMC says that it will buy more Volvo machines in the future as the units proved their ability to cope with India's tough climate, with temperatures as high as 40°C as well as high humidity and monsoon rains.

For more information on companies in this article

Related Content

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Italy's new southern highway route
    May 13, 2021
    An important new highway route is currently under construction in South Italy
  • Concrete pumps speed busy road upgrade
    February 14, 2012
    WORK ON a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city. The junction, when viewed from above, looks like a flatly pressed four-leaf clover, and can no longer cope with traffic volumes. Two national motorways, the A 9 and the A 92, intersect at the
  • Concrete pumps speed busy road upgrade
    May 3, 2012
    Work on a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city.