Skip to main content

Grading in tough conditions

Volvo graders have made an important contribution on upgrades to a 150km stretch of the NH7 highway, one of India's most important road links. The NH7 highway is an impressive 2,369km in length, linking the town of Kanyakumari, perched on the southern-most point of the Indian mainland where the Arabian Sea, Bay of Bengal and Indian Ocean meet, with the north-eastern holy city of Varanasi on the banks of the river Ganges.
July 6, 2012 Read time: 2 mins
Despite high temperatures and humidity, JMC's Volvo graders performed reliably on a project to upgrade part of India's important NH7 highway
2394 Volvo graders have made an important contribution on upgrades to a 150km stretch of the NH7 highway, one of India's most important road links. The NH7 highway is an impressive 2,369km in length, linking the town of Kanyakumari, perched on the southern-most point of the Indian mainland where the Arabian Sea, Bay of Bengal and Indian Ocean meet, with the north-eastern holy city of Varanasi on the banks of the river Ganges.

India's national highways make up just 2% of India's massive 3,300,000km road network but carry 40% of all traffic. Most boast two lanes in each direction, rising to four lanes around major cities. As India's economy has boomed, so has vehicle ownership and so has road building. The need to upgrade the NH7 for a 150km section between Madurai and Trichi in the southern state of Tamil Nadu had become pressing.

JMC Projects used two Volvo G720A motor graders on the job, each operating for 12 hours a day. The graders performed well on the three year project, which was completed recently and JMC says that it will buy more Volvo machines in the future as the units proved their ability to cope with India's tough climate, with temperatures as high as 40°C as well as high humidity and monsoon rains.

For more information on companies in this article

Related Content

  • Italian highway benefits from road recycling job
    October 3, 2014
    The latest equipment from Wirtgen has been used to recycle a stretch of Italy’s busy A4 Autostrada, one of the country’s most important highways. The Wirtgen machine was the first WR250 recycler/reclaimer to be delivered to Italy and was put to work on the A4 Turin-Trieste highway where it proved highly productive. The A4 Autostrada runs 522km from Turin to Trieste via Milan and Venice across northern Italy from west to east. The A4 is divided into five segments, the Turin-Milan, Milan-Brescia, Brescia-Pad
  • Better road safety can save lives worldwide
    January 24, 2017
    Road safety is an issue that rarely grabs headlines, although it is something that affects people around the globe. Road deaths account for a shockingly high percentage of deaths worldwide, with the risks being particularly high in developing countries. This poses such a threat to public health that the United Nations has been taking steps to address the issue, commencing with its Decade of Action on Road Safety in 2010. The focus has been on developing countries, due to the rapid increase in road deaths in
  • India announces four new highway deals
    May 29, 2012
    In India the authorities are approving a further four new highway projects. These will be worth nearly US$535 million in total. The highways are located in Uttar Pradesh, Madhya Pradesh, Bihar, West Bengal and Gujarat and the work involves widening and improving the existing NH34 in West Bengal as well as widening a 123km section of the link from Jetpur-Somnath in Gujarat. Both of these upgraded sections will be widened with two lanes in either direction.
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S