Skip to main content

Flyover replacement

French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of
February 22, 2012 Read time: 2 mins
French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of its machines and worked around the clock to complete the project on time. Demolition work was carried out at night by a total of eight machines, when the nearby road was closed, and rubble was cleared away during the day by six machines.
DSD Démolition used four 233 Hitachi excavators on the site. The bridge was demolished by a ZX470LCH-3 and ZX250LCN-3, which were both fitted with hydraulic hammer attachments, protective guards and lights to work through the night. The ZX470LCH-3 was equipped with a quick coupler to change between a standard and 26m high-reach boom. A ZX350LCN-3 fitted with a rotating concrete breaker attachment was used for crushing large concrete blocks into smaller pieces and clearing the site. An older ZX350LC with shears was used to cut concrete and steel bars.
Now the bridge has been demolished, work can start on the construction of a 1.2km tunnel beneath the road where it once stood. This will connect to an existing tunnel that runs beneath the old harbour.

For more information on companies in this article

Related Content

  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Strong interest for construction equipment show
    February 21, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.
  • Strong interest for construction equipment show
    May 2, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.
  • Indeco: Attached to growth
    July 4, 2023
    Attachment specialist Indeco notes a growing demand for products compatible with smaller-sized excavators, with the company looking to increase its range in response to this market trend.