Skip to main content

Flyover replacement

French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of
February 22, 2012 Read time: 2 mins
French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of its machines and worked around the clock to complete the project on time. Demolition work was carried out at night by a total of eight machines, when the nearby road was closed, and rubble was cleared away during the day by six machines.
DSD Démolition used four 233 Hitachi excavators on the site. The bridge was demolished by a ZX470LCH-3 and ZX250LCN-3, which were both fitted with hydraulic hammer attachments, protective guards and lights to work through the night. The ZX470LCH-3 was equipped with a quick coupler to change between a standard and 26m high-reach boom. A ZX350LCN-3 fitted with a rotating concrete breaker attachment was used for crushing large concrete blocks into smaller pieces and clearing the site. An older ZX350LC with shears was used to cut concrete and steel bars.
Now the bridge has been demolished, work can start on the construction of a 1.2km tunnel beneath the road where it once stood. This will connect to an existing tunnel that runs beneath the old harbour.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • DSS Group invests in Hitachi ZX670LC-5 excavator
    August 23, 2013
    One of Poland’s largest aggregates producers, DSS Group, has purchased a new Hitachi ZX670LC-5 for its quarry at Pilawa Górna in Lower Silesia. The company took delivery of the Zaxis-5 large excavator from Polish Hitachi dealer Tona in January 2013 as a key part of its strategy for aggregates production at the site. The DSS Group – owned by Dolnolskie Surowce Skalne SA – is the largest domestic producer of crushed aggregates for infrastructure projects. It has a 30-year licence to extract amphibolite (a
  • Hitachi’s excavator digs deep in the Swiss Jura
    May 1, 2015
    A new Hitachi ZX870LCR-5 owned by Swiss company Lachat is making a significant impact on the production process at the Asuel La Malcôte quarry in the canton of Jura. The large Zaxis-5 excavator is excavating a mixture of marlstone and limestone materials in a much cleaner way than before, as well as helping to sanitise the relatively unstable site. Lachat, founded in 1948 and taken over by the Steiner Group in June 2013, has 42 employees working in quarrying, recycling and the production of aggregates
  • Hitachi helps to build a better Stockholm
    November 19, 2024
    The ZE135 electric excavator has been put to the test on a high-profile development in the Stockholm Green Innovation District. This new growth area for technology and sustainability is being developed with the goal of renewing and building urban spaces with climate-smart solutions.