Skip to main content

Flyover replacement

French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of
February 22, 2012 Read time: 2 mins
French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of its machines and worked around the clock to complete the project on time. Demolition work was carried out at night by a total of eight machines, when the nearby road was closed, and rubble was cleared away during the day by six machines.
DSD Démolition used four 233 Hitachi excavators on the site. The bridge was demolished by a ZX470LCH-3 and ZX250LCN-3, which were both fitted with hydraulic hammer attachments, protective guards and lights to work through the night. The ZX470LCH-3 was equipped with a quick coupler to change between a standard and 26m high-reach boom. A ZX350LCN-3 fitted with a rotating concrete breaker attachment was used for crushing large concrete blocks into smaller pieces and clearing the site. An older ZX350LC with shears was used to cut concrete and steel bars.
Now the bridge has been demolished, work can start on the construction of a 1.2km tunnel beneath the road where it once stood. This will connect to an existing tunnel that runs beneath the old harbour.

For more information on companies in this article

Related Content

  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Hitachi ZX135US-5 and ZX210LC-5 excavators work in Sjodalen valley
    July 7, 2016
    Norwegian contractor Skogen has started building a service road for a log-cabin development in Norway’s Sjodalen valley. More than 90 of the 120m2 cabins are being constructed to order and the project is scheduled to be completed within the next 12 months. The Vågå-based company was set up in 1982 by owner Ola Skogen and is firmly focused on general construction activities including groundworks and roads, as well as foundations, drainage and utilities for log cabins. The contractor’s medium excavat
  • Tunnels and bridges, improving Argentina's major road link
    April 24, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • Tunnels and bridges, improving Argentina's major road link
    May 2, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock