Skip to main content

Flyover replacement

French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of
February 22, 2012 Read time: 2 mins
French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of its machines and worked around the clock to complete the project on time. Demolition work was carried out at night by a total of eight machines, when the nearby road was closed, and rubble was cleared away during the day by six machines.
DSD Démolition used four 233 Hitachi excavators on the site. The bridge was demolished by a ZX470LCH-3 and ZX250LCN-3, which were both fitted with hydraulic hammer attachments, protective guards and lights to work through the night. The ZX470LCH-3 was equipped with a quick coupler to change between a standard and 26m high-reach boom. A ZX350LCN-3 fitted with a rotating concrete breaker attachment was used for crushing large concrete blocks into smaller pieces and clearing the site. An older ZX350LC with shears was used to cut concrete and steel bars.
Now the bridge has been demolished, work can start on the construction of a 1.2km tunnel beneath the road where it once stood. This will connect to an existing tunnel that runs beneath the old harbour.

For more information on companies in this article

Related Content

  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • MB Crusher: Pushing attachment boundaries since 2001
    June 15, 2023
    For over 20 years, MB Crusher has offered a full line of innovative and patented jaw crusher and screener buckets and accessories for excavators, skid-steer loaders and backhoes of all sizes. Guy Woodford sat down with Alessia Valerio, MB's communications manager, at the recent 31st edition of SaMoTer in Verona to learn more about the company's latest developments and future growth plans