Skip to main content

Fast-track demolition

Heavy hydraulic breakers and a six-tonne combi cutter from Atlas Copco is said to have played a key part in enabling Armac to complete the demolition of the former Catthorpe motorway interchange viaduct within the 36 hours prescribed by the Highways Agency. Bridge dismantling experts Armac deployed no fewer than 10 Atlas Copco hydraulic breakers – six HB 4200, two HB 5800 and two HB 7000 units – to dismantle the 5,500tonne, 85metre long structure. In addition, Armac also used an Atlas Copco CC 6000 hydrauli
June 18, 2012 Read time: 2 mins
The CC 6000 is said to combine high breaking force with a short opening and closing time. This enables very high productivity to be achieved, especially as material can often be broken with one bite instead of the two bites required by other tools
Heavy hydraulic breakers and a six-tonne combi cutter from 161 Atlas Copco is said to have played a key part in enabling Armac to complete the demolition of the former Catthorpe motorway interchange viaduct within the 36 hours prescribed by the 2309 Highways Agency.

Bridge dismantling experts Armac deployed no fewer than 10 Atlas Copco hydraulic breakers – six HB 4200, two HB 5800 and two HB 7000 units – to dismantle the 5,500tonne, 85metre long structure. In addition, Armac also used an Atlas Copco CC 6000 hydraulic combination cutter to demolish the concrete and cut the 32 – 50mm rebar that reinforced the viaduct.

To allow the viaduct, which formerly carried the M6 southbound traffic over the M1 on the Warwickshire/Leicestershire border, to be demolished and removed, it was necessary to close both the M6 and the M1 in the vicinity of the work, so any overrun would have been costly and hugely disruptive to traffic flows over a wide area.

“We were happy to rely on Atlas Copco equipment for this high-profile and time-critical project,”says Noel McLean, contracts director at Armac. “This confidence was completely justified – all of Atlas Copco’s equipment performed faultlessly throughout the project, despite being used intensively and almost continuously.”

To prevent hold ups due to equipment problems during the demolition, Atlas Copco supplied a stock of critical spares to be held on site. None of the spares were needed, but their availability on site was said to provide additional insurance against the possibility of delays.

Such was the perceived success of Atlas Copco’s on-loan CC 6000 combi cutter, Armac is said to be giving serious consideration to purchasing one of these units for use on similar future projects.

For more information on companies in this article

Related Content

  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • Atlas Copco’s new MB 1650 hydraulic breaker is lighter
    December 15, 2017
    Atlas Copco’s new MB 1650 hydraulic breaker is lighter and more compact than its predecessor, the MB 1700, yet it gives the same high performance. According to the manufacturer, the MB 1650 weighs in at 1,650k and is suitable for carriers in the weight class 19-32tonnes. A redesigned service window offers greater accessibility and thus makes the attachment more maintenance friendly. With no high-pressure accumulator, the MB 1650´s maintenance and repair costs are lower, said Atlas.
  • New breaker from Atlas Copco
    March 7, 2012
    Three years ago Atlas Copco launched the first of the new generation of solid body breakers based on a new manufacturing method and new body design, and last year it sold more than 10,000 small breakers in the 50 to 550kg class. Atlas Copco SB breakers are used for road work, trenching, general demolition, plus primary and secondary rock breaking, and the company is now launching the mid-range model, the SB 302, for excavators of up to 9tonnes.
  • Tunnelling with Atlas Copco's HPT
    February 6, 2012
    Atlas Copco claims that its high precision tunnelling (HPT) system will offer greater productivity and reduced costs in drill and blast tunnelling operations. The HPT system is a package with five options for use on drill rigs and other types of construction equipment. Advanced PC-based software allows a worksite office to provide operational support to Atlas Copco rigs equipped with the Rig Control System (RCS). The Tunnel Manager system can help plan, store and evaluate data for the drilling process. This