Skip to main content

Efficient tunnelling

Liebherr's new tunnelling machine offers high production capacity and safety.
By MJ Woof May 13, 2024 Read time: 2 mins
Versatility and durability are key features of Liebherr’s new tunnel excavator

Liebherr says that its new R 930 Tunnel is specially designed for use in underground construction sites. The ruggedised machine offers versatility for the challenges and harsh working conditions of tunnelling and underground quarrying applications.

Developed at Liebherr-France SAS in Colmar (France), the R 930 Tunnel replaces the R 924 Compact Tunnel and allows high-level performance in all types of underground applications.

The R 930 Tunnel has been designed to meet the demands of underground construction sites with tight spaces and difficult access. The R 930 Tunnel’s attachment, available in two lengths, features a bearing that can swivel to 2x45° angles, allowing the excavation profile to be followed. The machine has a short slewing radius and powerful, protected LED headlights that reduce the risks of collision with construction site personnel and walls. In addition, the cylinders and hoses are specially positioned for maximum protection from potential impacts, limiting the risk of damage. The R 930 Tunnel has steel bodywork, making it a robust machine, ideal for underground applications. The new R 930 Tunnel crawler excavator can be equipped with the Liebherr quick coupling system, which allows tools to be changed quickly and easily.

A Liebherr two- or three-tooth ripper bucket ensures high productivity on underground construction sites. The R 930 Tunnel can also be equipped with a cutter or hammer to cover a broad area of applications. The R 930 Tunnel’s grading blade allows the creation of a flat ground surface and stabilises the machine on uneven ground. It also protects the undercarriage and crawler drives against impacts from rubble.

The whole ROPS-, FOPS- and FGPS-certified operator cab, along with its rear and side monitoring cameras, ensures construction site safety. It also has protection for its electronic components. Claimed to be comfortable and ergonomic, the cab is equipped to withstand dusty environments on underground sites. It comes with an easy-to-clean seat with headrest.

For more information on companies in this article

Related Content

  • Ambitious road tunnelling projects around the world
    November 29, 2013
    The construction of the world’s longest subsea road tunnel in Norway and a vital new link under the Bosphorus Strait in Turkey are among a host of exciting, major road tunnel-based projects currently being undertaken across the globe. Guy Woodford reports Sandvik DTi series tunnelling jumbos are being used for the excavation of Solbakktunnel, set to become the world’s longest subsea road tunnel.
  • BOMAG’s latest stabilisers: RS 250 and RS 300
    May 19, 2022
    Tractor-towed stabilisers are a new addition to BOMAG's product range – the RS 250 and RS 300.
  • Soilmec’s compact piling rig works in tight spots
    February 2, 2015
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Soilmec’s compact piling rig works in tight spots
    January 6, 2017
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger