Skip to main content

Demanding earthworks on major highway scheme

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 24, 2012 Read time: 1 min
Portuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

For more information on companies in this article

Related Content

  • XCMG sets out six stage path for future plans
    October 14, 2013
    XCMG has seen strong exports, with one deal in particular providing a major boost to turnover - Mike Woof writes It is rare that a single machine order can provide a substantial portion of a large manufacturer’s annual results. However the firm’s massive contract signed with the Venezuelan Government was a major boost to XCMG; the supply of no less than 6025 machines in a deal worth some US$750 million. This order came at an important time for the company when the world demand for construction equipment sl
  • Manufacturers push hybrid driveline technology
    April 22, 2014
    Driveline technology continues to develop rapidly, with many manufacturers at this year’s Conexpo exhibition showing Tier 4 Final emissions solutions, along with a host of fuel saving transmissions and hydraulic systems, all aiming to reduce operating costs for the customer. However, while there was certainly a hybrid presence at the show, things haven’t perhaps moved forward as fast as many had expected.
  • New asphalt pavers deliver better surface quality
    February 13, 2012
    Progressive paving improvements are offering better surface quality
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen